groundranger
Active · latest filing Sep 2026Residential

6504 Carrington Dr

Austin, TX 78749

EV charger and HVAC permits at 6504 Carrington Dr

City of Austin permits at 6504 Carrington Dr cover a Level 2 EV charger and replacement of the existing central heating and air system. The HVAC permit was filed October 24, 2025, and the EV charger permit was filed September 14, 2026; both are marked final.

Summarized from City of Austin records · updated Sep 14, 2026

Projects
2
2 filings
Latest filing
Sep 14, 2026
since Oct 24, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install level 2 ev charger

  1. AppliedSep 10, 2026
  2. IssuedSep 14, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspectionSep 17, 2026

Passed final inspection Sep 17, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6504 Carrington Dr

What work is permitted at 6504 Carrington Dr in Austin?

City of Austin records show a permit for replacing the existing central heat and air system and another for installing a Level 2 EV charger.

Is a new home being built at 6504 Carrington Dr?

The records provided list permits for an HVAC system replacement and an EV charger installation, not a new home.

When was the EV charger permitted at 6504 Carrington Dr?

The Level 2 EV charger permit, 2026-118881 EP, was filed September 14, 2026, and is marked final.

When was the HVAC system replacement permitted at 6504 Carrington Dr?

The mechanical permit, 2025-136765 MP, was filed October 24, 2025, and is marked final.

What kind of EV charger is planned at 6504 Carrington Dr?

The permit description says a Level 2 EV charger will be installed.

Are these permits for a commercial project at 6504 Carrington Dr?

The fact sheet classifies the address as residential. The listed work is an EV charger installation and replacement of the existing central heating and air system.

Also being built nearby

All of 78749
Email me when a new permit is filed