6505 Clay Allison Pass
Austin, TX 78749
6505 Clay Allison Pass: 1 project on record
City of Austin lists 1 filing across 1 project at 6505 Clay Allison Pass, Austin, TX 78749. The most recent, filed January 6, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jan 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 6, 2025
- since Jan 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 10, 2024
- IssuedJan 6, 2025
- WorkJan '25 – Jan '25
- Final inspectionJan 16, 2025
Passed final inspection Jan 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-161139 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6505 Clay Allison Pass
What is being built at 6505 Clay Allison Pass?
The latest filing (City of Austin permit 2024-161139 MP, January 6, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6505 Clay Allison Pass have?
1 filing across 1 project, from January 6, 2025 to January 6, 2025.
Is there other construction near 6505 Clay Allison Pass?
Yes. Nearby filings include 6433 Clay Allison Pass (express: replacing 8 windows (like for like), Mar 4, 2025); 8216 Siringo Pass (base: installing a backup battery system and additional meter socket, Aug 13, 2026); 8204 Siringo Pass (express: replace back 72x80 double prehung door with same size sliding door, Oct 14, 2024).
How do I get alerts for new permits at 6505 Clay Allison Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 6433 Clay Allison PassMar 4, 2025Express: replacing 8 windows (like for like) · 82 m away
- 8216 Siringo PassAug 13, 2026Base: installing a backup battery system and additional meter socket · 89 m away
- 8204 Siringo PassOct 14, 2024Express: replace back 72x80 double prehung door with same size sliding door · 113 m away
- 6408 Clairmont DrJul 15, 2026Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 6422 Clairmont DrNov 13, 2026Installation of a prefabricated plunge pool measuring at 20 x 10 with a depth of 5. equipment is a variable speed pump cartridge filter a saltwater chlorine generator and a ultratemp heat pump. prefab plunge ie pool is installed via a crane · 140 m away
- 8124 Siringo PassFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work przbocki · 154 m away
- 6404 Clairmont DrMay 6, 2026Express: replace 10 existing windows size for size · 167 m away
- 6700 Oasis DrJul 3, 2025Replacement of complete existing central heat and air system with or without duct work · 174 m away
- 6712 Oasis DrOct 12, 2026New construction accessory to primary in-ground pool · 182 m away
- 8112 Siringo PassNov 16, 2026Replacement of complete existing central heat and air system with or without duct work ethan moskowitz: replace 4t like-for-like hvac system · 196 m away
- 6401 Clay Allison PassDec 29, 2023Replacement of complete existing central heat and air system with or without duct work · 202 m away
- 6624 Oasis DrOct 16, 2024Irrigation system installation · 216 m away