6531 Fair Valley Trl
Austin, TX 78749
HVAC system replacement permitted at 6531 Fair Valley Trl
A replacement central heating and air system was permitted at 6531 Fair Valley Trl on April 1, 2026. Austin permit 2026-038526 MP describes a 3-ton condenser change-out in the backyard and a 66 btu furnace change-out in the attic, with or without duct work. The permit is marked final.
Summarized from City of Austin records · updated Apr 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2026
- since Apr 1, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 3-ton condenser change-out in backyard & 66 btu furnace change-out in attic
- AppliedMar 31, 2026
- IssuedApr 1, 2026
- WorkApr '26 – Oct '26
- Final inspectionOct 5, 2026
Passed final inspection Oct 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 3-ton condenser change-out in backyard & 66 btu furnace change-out in attic
Replacement of complete existing central heat and air system with or without duct work 3-ton condenser change-out in backyard & 66 btu furnace change-out in attic
City of Austin permitMechanical PermitFinal- Record
- 2026-038526 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6531 Fair Valley Trl
What is being built at 6531 Fair Valley Trl?
The permit records a replacement of the existing central heat and air system, not a new building. It includes a 3-ton condenser change-out in the backyard and a 66 btu furnace change-out in the attic.
When was the HVAC work at 6531 Fair Valley Trl permitted?
The City of Austin issued permit 2026-038526 MP on April 1, 2026. Its status is listed as final.
Is a new house being built at 6531 Fair Valley Trl?
The available permit describes replacement of an existing heating and air system. It does not describe new home construction.
What does permit 2026-038526 MP cover?
It covers a mechanical system replacement: a 3-ton condenser change-out in the backyard and a 66 btu furnace change-out in the attic, with or without duct work.
Is the heating and air system replacement at 6531 Fair Valley Trl complete?
The City of Austin permit record lists permit 2026-038526 MP as final.
Also being built nearby
All of 78749- 6527 Fair Valley TrlMay 29, 2026Replacement of an existing water heater replace like/like g water heater · 41 m away
- 6520 Fair Valley TrlAug 10, 2026Replacement of an existing water heater replacing water heater with similar model · 68 m away
- 6521 Fair Valley TrlSep 25, 2024Disconnect/reconnect no meter work done *add to: 2024-122975 ep* new 125a main service panel · 100 m away
- 6502 Targa CtNov 12, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton vertical gas split hvac system (indoor furnace evaporator coil and outdoor condenser) like-for-like as an hvac changeout/alteration. no structural change · 121 m away
- 6514 Fair Valley TrlSep 23, 2026Rebuild of an overhead residential service whose se cable and point of attachment have been damaged. we will install a new mast point of attachment 200a meter socket 200a mcb main panel new ground rods inter system bonding device whole house surge suppressor and new branch circuit breakers · 122 m away
- 5219 Summerset TrlOct 13, 2026Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system · 139 m away
- 6512 Fair Valley TrlApr 30, 2026Sewer spot repair: improper fittings allowing shifting and moving of pipe · 144 m away
- 6503 Targa CtDec 12, 2023Water heater replacement tunnel drain repair gas work · 147 m away
- 5302 Summerset TrlApr 10, 2026Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 151 m away
- 6547 Fair Valley TrlSep 5, 2026Replacement of complete existing central heat and air system with or without duct work full gas system replacement with duct · 157 m away
- 5200 Maulding PassAug 13, 2024Request to disconnect upgrade electrical service to 200a. installation of a 200a service-rated automatic transfer switch load center a 24kw whole home generator additional grounding and type 2 surge protection · 158 m away
- 5215 Summerset TrlNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 162 m away