Rooftop solar and battery permits at 7109 Gentle Oak Dr

Austin permits indicate a new 7.37 kW rooftop solar system and 13.5 kW energy storage system for the existing residence at 7109 Gentle Oak Dr. The related electrical permits were filed September 25 and October 6, 2026.

Summarized from City of Austin records · updated Oct 6, 2026

Projects
2
2 filings
Latest filing
Oct 6, 2026
since Sep 25, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Install new 7.37kw rooftop solar system and 13.5kw energy storage system for existing residential only

  1. AppliedSep 23, 2026
  2. IssuedOct 6, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
24% through of the permit windowOct 6, 2026 → Apr 4, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 7.37kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 7.37kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7109 Gentle Oak Dr

What is being installed at 7109 Gentle Oak Dr?

Austin permit 2026-125478 EP describes a new 7.37 kW rooftop solar system and 13.5 kW energy storage system for an existing residence. It was filed October 6, 2026.

Is there a battery installation planned at 7109 Gentle Oak Dr?

Yes. Permit 2026-125478 EP, filed October 6, 2026, describes a 13.5 kW energy storage system alongside a new rooftop solar system.

When were the permits filed for the solar system at 7109 Gentle Oak Dr?

The related Austin electrical permits were filed September 25 and October 6, 2026. They cover tying in the solar and storage components and installing the new system.

Is 7109 Gentle Oak Dr a new construction project?

The October 6, 2026 permit describes work for an existing residence, not a new building. The project is a rooftop solar and energy storage installation.

Will the electrical service or meter size change at 7109 Gentle Oak Dr?

The September 25, 2026 permit, 2026-125496 EP, says the work ties in the solar and energy storage components without upgrading the service or meter size.

Also being built nearby

All of 78749

More warehouses & industrial in 78749, solar installs in 78749.

Email me when it passes final inspection