7223 Ridge Oak Rd
Austin, TX 78749
7223 Ridge Oak Rd: 3 projects on record
City of Austin lists 3 filings across 3 projects at 7223 Ridge Oak Rd, Austin, TX 78749 since February 15, 2024. The most recent, filed June 23, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system”.
Compiled from City of Austin records · updated Jun 23, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 23, 2025
- since Feb 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system
- AppliedJun 9, 2025
- IssuedJun 23, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 7, 2025
Passed final inspection Jul 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-070939 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-047590 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Abandon leaking line and reroute it in the attic between the water heater and the master bathroom lavatory
Abandon leaking line and reroute it in the attic between the water heater and the master bathroom lavatory
City of Austin permitPlumbing PermitFinal- Record
- 2024-017634 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7223 Ridge Oak Rd
What is being built at 7223 Ridge Oak Rd?
The latest filing (City of Austin permit 2025-070939 MP, June 23, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system.
How many permits and filings does 7223 Ridge Oak Rd have?
3 filings across 3 projects, from February 15, 2024 to June 23, 2025.
Is there other construction near 7223 Ridge Oak Rd?
Yes. Nearby filings include 6320 Poncha Pass (replacement of complete existing central heat and air system with or without duct work, Jun 17, 2026); 7120 Wandering Oak Rd (replacement of complete existing central heat and air system with or without duct work, Apr 8, 2024); 6308 Poncha Pass (replacement of complete existing central heat and air system with or without duct work, Dec 1, 2025).
How do I get alerts for new permits at 7223 Ridge Oak Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 6320 Poncha PassJun 17, 2026Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 7120 Wandering Oak RdApr 8, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 6308 Poncha PassDec 1, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 7117 Bending Oak RdJul 15, 2025Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 6325 Poncha PassAug 4, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 6401 Poncha PassNov 4, 2024Addition of existing sfr. new 1 story sunroom and new deck. also installing 1 ceiling fan w light. 2 switches 4 electrical posts 4 gfci receptables. 1 exit light · 100 m away
- 7116 Bending Oak RdJul 24, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 6403 Poncha PassMar 20, 2025Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 7205 Kenosha PassOct 23, 2026Electrical service rebuild 200a overhead service. includes a new roof penetration for 2-inch rigid riser feeding into a new 200a lever bypass meter can. a main disconnect is being added to the exterior of the home - with a verifiable grounding and bonding system and surge protection · 119 m away
- 7109 Bending Oak RdNov 27, 2024Replacement of an existing water heater replacing 2 40 gal tank type natural gas water heaters in attic like for like · 123 m away
- 7201 Kenosha PassJul 23, 2026Upgrade 200amp service and new subpanel · 124 m away
- 7120 Gentle Oak DrOct 7, 2026Express - replace 16 existing windows - size for size replace 1 existing entry door - size for size · 126 m away