8101 Croftwood Dr
Austin, TX 78749 · Austin Independent School District
Shade structure permitted at Boone Elementary
A shade structure is planned at Boone Elementary School at 8101 Croftwood Dr. The City of Austin issued an active building permit for the AISD project on June 5, 2026. Earlier 2007 records include portable classrooms and an eight-classroom addition.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jun 5, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Jun 5, 2026
- since Mar 2, 2007
- Largest scope
- 1,500 sf
- Estimated cost
- $307K
- state registration
Where this project stands
Permit active · work underwayInstall shade structure at boone es. aisd project
- AppliedJun 4, 2026
- IssuedJun 5, 2026
- WorkJun '26 – Dec '26
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
8 projectsInstall shade structure at boone es. aisd project
Install shade structure at boone es. aisd project
City of Austin permitBuilding PermitActive- Record
- 2026-071316 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
City of Austin permitMechanical PermitFinal- Record
- 2024-075848 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
City of Austin permitElectrical PermitFinal- Record
- 2024-075848 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes mechanical and electrical scope
City of Austin permitBuilding PermitFinal- Record
- 2024-075848 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Refit of existing building foyer and administration offices for a secure interior vestibule and associated security hardware — boone elementary school
TDLR project registrationRenovation/AlterationProject Closed1,500 sq ft$307K est.- Project #
- TABS2024015176
- Tenant / owner
- Boone Elementary School Secure Vestibule
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 8101 Croftwood Dr
What is being built at 8101 Croftwood Dr in Austin?
A shade structure is planned at Boone Elementary School. The City of Austin permit, 2026-071316 BP, describes installing a shade structure for an AISD project.
When was the Boone Elementary shade structure permitted?
The active City of Austin building permit was filed June 5, 2026. Its permit number is 2026-071316 BP.
Is the project at 8101 Croftwood Dr for a school?
Yes. The permit description identifies Boone Elementary and an AISD project.
What is the status of the permit for 8101 Croftwood Dr?
The City of Austin lists permit 2026-071316 BP as active. It describes installing a shade structure at Boone Elementary.
Were there earlier construction projects at Boone Elementary?
Yes. City of Austin records dated March 2, 2007, include portable classroom cases and a site plan for an eight-classroom addition.
Also being built nearby
All of 78749- 8104 Croftwood DrNov 13, 2025Express- replace 6 windows and 2 doors like for like · 99 m away
- 8000 Croftwood DrDec 4, 2025Replacement of complete existing central heat and air system with or without duct work the american standard gold 17 is a high-efficiency two-stage air conditioner delivering up to 17.1 seer2 performance with r-454b refrigerant · 129 m away
- 3932 Leafield DrDec 8, 2025Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 3804 Leafield DrFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 7906 Wycombe DrFeb 6, 2024Replacement of an existing water heater · 162 m away
- 7907 Croftwood DrNov 10, 2026New construction of detached dwelling unit to rear of existing dwelling. 1 story 1 bath · 179 m away
- 3613 Leafield DrJun 17, 2024Tunnel repair on drain system · 181 m away
- 3611 Leafield DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 188 m away
- 8202 Croftwood DrAug 13, 2025Replacement of an existing water heater 40gal gas water heater · 193 m away
- 3608 Alexandria DrMar 12, 2026Replacement of complete existing central heat and air system with or without duct work · 193 m away
- 3509 Leafield DrOct 23, 2025Instalation of 3.87kw solar system · 199 m away
- 7904 Woodcroft DrMar 6, 2024Replacement of an existing water heater · 199 m away