9305 Le Conte Cv
Austin, TX 78749
9305 Le Conte Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 9305 Le Conte Cv, Austin, TX 78749. The most recent, filed September 15, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Sep 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedSep 12, 2025
- IssuedSep 15, 2025
- WorkSep '25 – Mar '26
- Final inspectionSep 28, 2025
Passed final inspection Sep 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-116109 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9305 Le Conte Cv
What is being built at 9305 Le Conte Cv?
The latest filing (City of Austin permit 2025-116109 EP, September 15, 2025) covers install evse.
How many permits and filings does 9305 Le Conte Cv have?
1 filing across 1 project, from September 15, 2025 to September 15, 2025.
Is there other construction near 9305 Le Conte Cv?
Yes. Nearby filings include 6409 Salcon Cliff Dr (avery - 40-23269 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground svc requesting wire pull, Oct 7, 2026); 9310 Le Conte Cv (replacement of complete existing central heat and air system with or without duct work, Aug 13, 2025); 6317 Hillside Terrace Dr (replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system, Oct 24, 2025).
How do I get alerts for new permits at 9305 Le Conte Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 6409 Salcon Cliff DrOct 7, 2026Avery - 40-23269 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 amp main breaker. upgrading revenue meter to 200 amps. underground svc requesting wire pull · 42 m away
- 9310 Le Conte CvAug 13, 2025Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 6317 Hillside Terrace DrOct 24, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 95 m away
- 9307 La Puente DrJun 10, 2026Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 6500 Hillside Terrace DrMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 6502 Hillside Terrace DrMay 7, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 9311 La Puente DrApr 4, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 112 m away
- 6308 Mesa Grande DrDec 22, 2025Ev charger · 123 m away
- 6506 Hillside Terrace DrMay 2, 2025Express: window replacement (10 windows like for like) · 131 m away
- 9406 La Puente DrDec 29, 2025Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 6315 Salcon Cliff DrFeb 21, 2025Install level 2 ev charger · 151 m away
- 6310 Hillside Terrace DrDec 8, 2023Replacement of complete existing central heat and air system with or without duct work · 163 m away