9532 Colebrook St
Austin, TX 78749
EV charger permit filed for 9532 Colebrook St
A City of Austin electrical permit for an EV charger at this residence was filed on September 17, 2026, and is marked final. An earlier permit to replace 15 existing windows was filed July 11, 2025, and is marked expired.
Summarized from City of Austin records · updated Sep 17, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 17, 2026
- since Jul 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of ev charger
- AppliedSep 15, 2026
- IssuedSep 17, 2026
- WorkSep '26 – Mar '27
- Final inspectionSep 29, 2026
Passed final inspection Sep 29, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInstallation of ev charger
Installation of ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-121075 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express - replace 15 existing windows - size for size
Express - replace 15 existing windows - size for size
City of Austin permitBuilding PermitExpired- Record
- 2025-086426 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-140654 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace 9 windows like for like
Express: replace 9 windows like for like
City of Austin permitBuilding PermitExpired- Record
- 2023-131595 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9532 Colebrook St
What work is permitted at 9532 Colebrook St?
City of Austin records list an EV charger installation and a permit to replace 15 existing windows.
Was an EV charger permitted at 9532 Colebrook St?
Yes. Electrical permit 2026-121075 EP, filed September 17, 2026, is for an EV charger installation and is marked final.
Is a new home being built at 9532 Colebrook St?
The records provided do not list a new-home construction permit. They show permits for an EV charger installation and window replacement.
What happened to the window replacement permit at 9532 Colebrook St?
Building permit 2025-086426 BP was filed July 11, 2025, to replace 15 existing windows with the same-size windows. Its status is expired.
When was the latest permit filed for 9532 Colebrook St?
The latest listed permit was filed September 17, 2026, for an EV charger installation.
Also being built nearby
All of 78749- 9524 Colebrook StAug 30, 2024Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 6217 Carrington DrFeb 6, 2024New pool and spa · 62 m away
- 6213 Carrington DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 9521 Colebrook StFeb 8, 2024Install evse at garage · 82 m away
- 6237 Carrington DrSep 3, 2026Install level 2 ev charger · 87 m away
- 9604 Prescott DrMay 29, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 6205 Carrington DrFeb 13, 2026Express: replace 4 windows (like for like) · 100 m away
- 9524 Prescott DrMar 19, 2024Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 9520 Hopeland DrJan 22, 2026Install level 2 ev charger · 110 m away
- 9508 Colebrook StMay 7, 2026Not pre-plumed water softener install. no electrical work · 112 m away
- 9516 Hopeland DrNov 8, 2024Install new water softener · 117 m away
- 9509 Colebrook StMay 21, 2024Replacement of an existing water heater · 124 m away