10000 Richelieu Rd
Austin, TX 78750
10000 Richelieu Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 10000 Richelieu Rd, Austin, TX 78750. The most recent, filed June 18, 2025, covers: “Installation of residential ev charger”.
Compiled from City of Austin records · updated Jun 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2025
- since Jun 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of residential ev charger
- AppliedJun 16, 2025
- IssuedJun 18, 2025
- WorkJun '25 – Jun '25
- Final inspectionJun 26, 2025
Passed final inspection Jun 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstallation of residential ev charger
Installation of residential ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-074740 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10000 Richelieu Rd
What is being built at 10000 Richelieu Rd?
The latest filing (City of Austin permit 2025-074740 EP, June 18, 2025) covers installation of residential ev charger.
How many permits and filings does 10000 Richelieu Rd have?
1 filing across 1 project, from June 18, 2025 to June 18, 2025.
Is there other construction near 10000 Richelieu Rd?
Yes. Nearby filings include 10001 Richelieu Rd (uninstall 26 existing windows and replace with 26 new windows of same size; like for like install, Aug 26, 2025); 9905 Richelieu Rd (replacement of an existing water heater, Aug 14, 2024); 10000 Brandywine Cir (new construction of 2nd dwellingn unit 484sf with bedroom full bathroom covered patio, Aug 22, 2025).
How do I get alerts for new permits at 10000 Richelieu Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10001 Richelieu RdAug 26, 2025Uninstall 26 existing windows and replace with 26 new windows of same size; like for like install · 71 m away
- 9905 Richelieu RdAug 14, 2024Replacement of an existing water heater · 90 m away
- 10000 Brandywine CirAug 22, 2025New construction of 2nd dwellingn unit 484sf with bedroom full bathroom covered patio · 98 m away
- 10903 Spicewood Club DrJul 17, 2025Replacement of an existing water heater · 113 m away
- 9903 Richelieu RdNov 3, 2025Upgrade/relocate existing 200 amp service to new 400 amp service. relocate circuity as needed · 115 m away
- 9807 Brandywine CirOct 20, 2024Express: replace siding replace windows like for like minor electrical work (move switches and plugs replace electrical box and weather proof cover to outlet) · 123 m away
- 9803 Brandywine CirAug 3, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. [3bed 2bath] work to include: interior remodel first floor addition second floor addition new beds new baths [5bed 4bath] · 123 m away
- 9900 Richelieu RdFeb 29, 2024Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 9905 Brandywine CirAug 21, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 2 ton 14 seer2 two stage heat pump and air handler · 134 m away
- 9806 Mandeville CirMar 20, 2026We are replacing a water heater 40 gallon electric in an attic · 147 m away
- 10900 Spicewood Club DrMar 19, 2025Interior remodel. tub to shower conversion replacing vanities new lighting layout · 160 m away
- 9802 Brandywine CirJul 17, 2026Replacement of an existing water heater · 176 m away