EV charger installation permitted at 10100 Pickfair Dr
An EV charger installation at this Austin residence was permitted on April 8, 2026. City permit 2026-041325 EP describes a hardwired GM PowerUp 2 charger in the garage on a 60-amp circuit.
Summarized from City of Austin records · updated Apr 8, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 8, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
- AppliedApr 6, 2026
- IssuedApr 8, 2026
- WorkApr '26 – May '26
- Final inspectionMay 26, 2026
Passed final inspection May 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsEv charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
Ev charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
City of Austin permitElectrical PermitFinal- Record
- 2026-041325 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Ev install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2023-080561 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10100 Pickfair Dr
What is being installed at 10100 Pickfair Dr?
A City of Austin permit describes installation of a hardwired GM PowerUp 2 EV charger in the garage. The permit was filed April 8, 2026.
When was the EV charger permitted at 10100 Pickfair Dr?
The City of Austin issued permit 2026-041325 EP on April 8, 2026. Its status is listed as Final.
What electrical work does permit 2026-041325 EP cover?
The permit describes adding a 60-amp, 240-volt breaker and routing a branch circuit to the garage charger. It says the charger can draw up to 48 amps continuously.
Was there an earlier EV installation permit at this address?
Yes. City of Austin permit 2023-080561 EP, dated June 27, 2023, is described as an EV installation. It is also listed as Final.
Is a new building being constructed at 10100 Pickfair Dr?
The records provided list electrical permits for EV charger installations, not a new-building project. The latest permit is dated April 8, 2026.
Also being built nearby
All of 78750- 10102 Eastman CvJan 3, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 10104 Eastman CvJul 3, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 10120 Pickfair DrMay 22, 2024Replacement of an existing water heater · 123 m away
- 9909 Pickfair DrJun 23, 2025Replacement of complete existing central heat and air system with or without duct work 5 ton (15 seer) complete horiz gas system · 143 m away
- 10105 Ullswater CvSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 162 m away
- 9711 Tree Bend DrNov 14, 2025Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 9907 Pickfair DrMar 21, 2024Install level 2 ev charger · 172 m away
- 9908 Pickfair DrDec 15, 2023Install new 12.76kw rooftop solar system and 27kw energy storage system for existing residential only. pec utility · 175 m away
- 10200 Pickfair DrJun 6, 202540ft water yard line repair · 180 m away
- 10104 Ullswater CvSep 14, 2026Replacement of complete existing central heat and air system with or without duct work · 194 m away
- 10204 Spicewood PkwyJun 28, 2024Install level 2 ev charger · 207 m away
- 10104 Chester LnSep 30, 2026***timed in-person inspection: 10/15/2026 @ 1 pm*** replacement of an existing water heater · 208 m away