groundranger
Recent · latest filing Apr 2026Residential

10100 Pickfair Dr

Austin, TX 78750

EV charger installation permitted at 10100 Pickfair Dr

An EV charger installation at this Austin residence was permitted on April 8, 2026. City permit 2026-041325 EP describes a hardwired GM PowerUp 2 charger in the garage on a 60-amp circuit.

Summarized from City of Austin records · updated Apr 8, 2026

Projects
2
2 filings
Latest filing
Apr 8, 2026
since Apr 8, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Ev charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

  1. AppliedApr 6, 2026
  2. IssuedApr 8, 2026
  3. WorkApr '26 – May '26
  4. Final inspectionMay 26, 2026

Passed final inspection May 26, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Ev charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    Ev charger installation. install 60 amp 240 volt breaker in the main panel using an available slot. route branch circuit directly behind the main panel and hard wire the gm power up 2 onto the interior side wall of the garage. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Ev install

    Ev install

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10100 Pickfair Dr

What is being installed at 10100 Pickfair Dr?

A City of Austin permit describes installation of a hardwired GM PowerUp 2 EV charger in the garage. The permit was filed April 8, 2026.

When was the EV charger permitted at 10100 Pickfair Dr?

The City of Austin issued permit 2026-041325 EP on April 8, 2026. Its status is listed as Final.

What electrical work does permit 2026-041325 EP cover?

The permit describes adding a 60-amp, 240-volt breaker and routing a branch circuit to the garage charger. It says the charger can draw up to 48 amps continuously.

Was there an earlier EV installation permit at this address?

Yes. City of Austin permit 2023-080561 EP, dated June 27, 2023, is described as an EV installation. It is also listed as Final.

Is a new building being constructed at 10100 Pickfair Dr?

The records provided list electrical permits for EV charger installations, not a new-building project. The latest permit is dated April 8, 2026.

Also being built nearby

All of 78750
Email me when a new permit is filed