10108 Talleyran Dr
Austin, TX 78750
10108 Talleyran Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 10108 Talleyran Dr, Austin, TX 78750. The most recent, filed July 3, 2024, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Jul 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2024
- since Jul 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJul 2, 2024
- IssuedJul 3, 2024
- WorkJul '24 – Dec '24
- Final inspectionJul 8, 2024
Passed final inspection Jul 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-082517 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10108 Talleyran Dr
What is being built at 10108 Talleyran Dr?
The latest filing (City of Austin permit 2024-082517 EP, July 3, 2024) covers install level 2 ev charger.
How many permits and filings does 10108 Talleyran Dr have?
1 filing across 1 project, from July 3, 2024 to July 3, 2024.
Is there other construction near 10108 Talleyran Dr?
Yes. Nearby filings include 10104 Talleyran Dr (replacement of complete existing central heat and air system with or without duct work, Feb 26, 2025); 9400 Rolling Oaks Trl (replacement of an existing water heater replace 40-gallon electric water heater located in garage closet, Feb 3, 2026); 9310 Rolling Oaks Trl (express: replacing 19 windows like for like, Jul 22, 2026).
How do I get alerts for new permits at 10108 Talleyran Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10104 Talleyran DrFeb 26, 2025Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 9400 Rolling Oaks TrlFeb 3, 2026Replacement of an existing water heater replace 40-gallon electric water heater located in garage closet · 67 m away
- 9310 Rolling Oaks TrlJul 22, 2026Express: replacing 19 windows like for like · 67 m away
- 10201 Mystic Oaks CirApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 9311 Rolling Oaks TrlAug 11, 2026(seo jongmin) - installation of circuit for elec. vehicle charging station - esip · 116 m away
- 9303 Mystic Oaks TrlMay 29, 2026Replacement of complete existing central heat and air system with or without duct work alan lin · 124 m away
- 9403 Rolling Oaks TrlJun 11, 2026Replacement of an existing water heater replace 50-gallon electric water heater · 141 m away
- 9400 Mystic Oaks TrlNov 9, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 5-ton vertical hvac system like-for-like · 142 m away
- 9406 Rolling Oaks TrlJul 17, 2024Install evse · 147 m away
- 10202 Mystic Oaks CirMar 5, 2024In ground swimming pool swim spa and spa with required enclosure device for existing sfr. stone decking and fire pit · 161 m away
- 9205 Mystic Oaks TrlApr 28, 2026Replacement of an existing water heater · 163 m away
- 9305 Rolling Oaks TrlFeb 27, 2024Replace existing main electrical panel with new same size panel will not need meter to be removed. the main disconnect is located at the pad mount transfer will change out existing panel to have main breaker and install new breakers with existing branch circuits only · 171 m away