10300 Anderson Mill Rd
Austin, TX 78750
Food-business change of use permitted in 2025
Permits at 10300 Anderson Mill Rd indicate a change of use for a food business. The building permit was filed April 25, 2025, and building, plumbing, and electrical permits were marked final by May 6, 2025.
Summarized from City of Austin records · updated Feb 19, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Feb 19, 2026
- since Apr 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredUpgrade single phase 150a service to a 200a three phase service
- AppliedFeb 9, 2026
- IssuedFeb 19, 2026
- !WorkFeb '26 – Aug '26
- Final inspection
Marked expired Aug 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsUpgrade single phase 150a service to a 200a three phase service
Upgrade single phase 150a service to a 200a three phase service
City of Austin permitElectrical PermitExpired- Record
- 2026-015558 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use-food business
Change of use-food business
City of Austin permitElectrical PermitFinal- Record
- 2025-039784 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use-food business
Change of use-food business
City of Austin permitPlumbing PermitFinal- Record
- 2025-039784 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use-food business
Change of use-food business
City of Austin permitBuilding PermitFinal- Record
- 2025-039784 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Up grade exiting service field inspect
Up grade exiting service field inspect
City of Austin permitElectrical PermitFinal- Record
- 2021-186723 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10300 Anderson Mill Rd
What is being built at 10300 Anderson Mill Rd?
City of Austin permits indicate a change of use for a food business. The records do not identify a specific business or say whether it has opened.
Is a restaurant opening at 10300 Anderson Mill Rd?
The permits describe a change of use for a food business, but do not identify a restaurant or a tenant.
When was the food-business permit filed at 10300 Anderson Mill Rd?
The building permit, 2025-039784 BP, was filed April 25, 2025. Related plumbing and electrical permits were filed May 1 and May 6, 2025.
Are the permits for 10300 Anderson Mill Rd approved?
The building, plumbing, and electrical permits for the food-business change of use are marked final. The records do not confirm that the business is open.
What is the latest permit at 10300 Anderson Mill Rd?
Permit 2026-015558 EP, filed February 19, 2026, proposed upgrading electrical service from single-phase 150 amps to three-phase 200 amps. Its status is expired.
Is construction still underway at 10300 Anderson Mill Rd?
The change-of-use permits are marked final, while the later electrical-service upgrade permit is marked expired. The records do not state whether work is currently underway.
Also being built nearby
All of 78750- 10302 Burmaster LnMar 19, 2026Express: foundation repair · 46 m away
- 11812 Millwright PkwyMay 2, 2025Submittal for health review to receive health permit for previously approved but not utilized kitchen for day care facility to distribute food provided by catering company · 50 m away
- 10259 Missel Thrush DrJun 23, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton gas hvac system like-for-like (furnace coil condenser); no structural change · 117 m away
- 10309 Caracara DrOct 29, 2026Replacement of an existing water heater change out of natural gas water heater like for like · 140 m away
- 10257 Missel Thrush DrSep 15, 2025200 amp underground electrical service panel and meter base replacement and upgrade · 141 m away
- 10304 Caracara DrNov 21, 2024Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 11815 Millwright PkwyJan 4, 2024Upgrading existing underground service from 125. we will also be updating grounding · 150 m away
- 10401 Anderson Mill RdSep 28, 2026Change of use office to personalservice existing commercial suite with non structural interior work only aka paint. no electrical plumbing mechanical or structural work. there was no pre-existing co for the suite · 159 m away
- 11818 Millwright PkwyOct 2, 2025Install 4 ton 2 stage gas upflow in place of old unit · 167 m away
- 10417 Mourning Dove DrOct 17, 2024Replacement of an existing water heater · 174 m away
- 10402 Burmaster LnJul 16, 2024Express - uninstall existing 6 windows and replace with 6 new windows of same size and operation; like for like install b unit only · 175 m away
- 10254 Missel Thrush DrAug 25, 2026Install new 4.3kw rooftop solar system for existing residential only · 176 m away