10526 School House Ln
Austin, TX 78750
10526 School House Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 10526 School House Ln, Austin, TX 78750. The most recent, filed August 19, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 19, 2025
- since Aug 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 12, 2025
- IssuedAug 19, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 29, 2025
Passed final inspection Aug 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-101708 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10526 School House Ln
What is being built at 10526 School House Ln?
The latest filing (City of Austin permit 2025-101708 MP, August 19, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 10526 School House Ln have?
1 filing across 1 project, from August 19, 2025 to August 19, 2025.
Is there other construction near 10526 School House Ln?
Yes. Nearby filings include 10524 School House Ln (express: siding replacement, Nov 3, 2025); 10600 Leather Cv (replacement of complete existing central heat and air system with or without duct work changeout, Oct 29, 2026); 10601 Leather Cv (install/replace (200 amp) meter base & main panel (underground), Aug 2, 2024).
How do I get alerts for new permits at 10526 School House Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10524 School House LnNov 3, 2025Express: siding replacement · 12 m away
- 10600 Leather CvOct 29, 2026Replacement of complete existing central heat and air system with or without duct work changeout · 34 m away
- 10601 Leather CvAug 2, 2024Install/replace (200 amp) meter base & main panel (underground) · 47 m away
- 10606 School House LnFeb 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas vertical system · 68 m away
- 10500 Salt Block CirJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 10605 Leather CvAug 10, 2026Express: bathroom 1: demolition nonstructural wall; convert tub to shower; all like for like bathroom 2: demolition nonstructural wall; all like for like · 69 m away
- 10516 School House LnMar 10, 2026Replacement of an existing water heater replace like/like g water heater · 89 m away
- 10510 School House LnOct 2, 2026Express: foundation repair · 140 m away
- 12210 Double Tree LnApr 17, 2026Replacement of an existing water heater remove and replace water heater - 40 gal gas · 145 m away
- 12321 Double Tree LnOct 3, 2024Replacement of complete existing central heat and air system with or without duct work · 158 m away
- 12326 Double Tree LnJul 31, 2026Excavate 35 tunnel to repair main drain line under the house · 159 m away
- 12208 Double Tree LnApr 28, 2025Express: removed junk/debris old flooring old cabinets and fixtures removed popcorn ceiling removed damaged drywall wall paper retextured paint new flooring remodel the bathrooms install new cabinets light fixture kitchen and plumbing fixture (not relocating) replace all doors and windows like for like new appliances revision-plumbing work for change out of shower valve · 162 m away