10600 Mourning Dove Dr
Austin, TX 78750
10600 Mourning Dove Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 10600 Mourning Dove Dr, Austin, TX 78750. The most recent, filed November 21, 2023, covers: “Express: window replacement (like for like)”.
Compiled from City of Austin records · updated Nov 21, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2023
- since Nov 21, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: window replacement (like for like)
- AppliedNov 20, 2023
- IssuedNov 21, 2023
- WorkNov '23 – Jun '24
- Final inspectionJun 4, 2024
Passed final inspection Jun 4, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: window replacement (like for like)
Express: window replacement (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2023-149815 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10600 Mourning Dove Dr
What is being built at 10600 Mourning Dove Dr?
The latest filing (City of Austin permit 2023-149815 BP, November 21, 2023) covers express: window replacement (like for like).
How many permits and filings does 10600 Mourning Dove Dr have?
1 filing across 1 project, from November 21, 2023 to November 21, 2023.
Is there other construction near 10600 Mourning Dove Dr?
Yes. Nearby filings include 10605 Mourning Dove Dr (wire a new free standing 200 sq ft shed, Dec 9, 2024); 10511 Mourning Dove Dr (replacement of complete existing central heat and air system with or without duct work hvac replacement: 3.5-ton goodman or payne 14-seer heat pump ac & heating system, Nov 12, 2024); 10605 Doering Ln (gas test, Jan 16, 2026).
How do I get alerts for new permits at 10600 Mourning Dove Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10605 Mourning Dove DrDec 9, 2024Wire a new free standing 200 sq ft shed · 53 m away
- 10511 Mourning Dove DrNov 12, 2024Replacement of complete existing central heat and air system with or without duct work hvac replacement: 3.5-ton goodman or payne 14-seer heat pump ac & heating system · 60 m away
- 10605 Doering LnJan 16, 2026Gas test · 64 m away
- 10509 Mourning Dove DrOct 9, 2025Express: tear off existing shingles and install 24 ga 1/5 snap lock standing seam metal roofing · 79 m away
- 10511 Doering LnMay 13, 2025This kitchen renovation project involves the demolition of existing cabinets fur down countertops and backsplash along with relocating the a/c vent to the ceiling (moving 6 to right). a new range hood will be installed and the popcorn ceiling will be removed across 350 sq ft the project also includes installing new cabinets adding under-cabinet lighting and upgrading the existing lighting by replacing two ceiling fixtures with five can lights. additionally a breaker will be added to the panel ensuring improved electrical capacity · 82 m away
- 10600 Wagon Gap DrApr 21, 2026Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 10506 Wagon Gap DrMar 13, 2026Install new 2.125kw rooftop solar system for existing residential only · 94 m away
- 10507 Mourning Dove DrJun 27, 2025Replacement of an existing water heater · 98 m away
- 10510 Doering LnOct 6, 2024Express: replace 832 sq ft of siding replace 6 windows like for like · 107 m away
- 10502 Wagon Gap DrJan 31, 2024Express: replace 10 windows like for like · 125 m away
- 11613 Crosstimber DrMar 28, 2025Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 10612 Mourning Dove DrSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away