groundranger
Historic · latest filing Mar 2025Residential

10812 Keystone Bnd

Austin, TX 78750

10812 Keystone Bnd: 2 projects on record

City of Austin lists 2 filings across 2 projects at 10812 Keystone Bnd, Austin, TX 78750 since February 21, 2024. The most recent, filed March 4, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work two stage 410a iaq 3000 surge protection upstairs plenum double system”.

Compiled from City of Austin records · updated Mar 4, 2025

Projects
2
2 filings
Latest filing
Mar 4, 2025
since Feb 21, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work two stage 410a iaq 3000 surge protection upstairs plenum double system

  1. AppliedFeb 25, 2025
  2. IssuedMar 4, 2025
  3. WorkMar '25 – Oct '25
  4. Final inspectionOct 10, 2025

Passed final inspection Oct 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work two stage 410a iaq 3000 surge protection upstairs plenum double system

    Replacement of complete existing central heat and air system with or without duct work two stage 410a iaq 3000 surge protection upstairs plenum double system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10812 Keystone Bnd

What is being built at 10812 Keystone Bnd?

The latest filing (City of Austin permit 2025-022177 MP, March 4, 2025) covers replacement of complete existing central heat and air system with or without duct work two stage 410a iaq 3000 surge protection upstairs plenum double system.

How many permits and filings does 10812 Keystone Bnd have?

2 filings across 2 projects, from February 21, 2024 to March 4, 2025.

Is there other construction near 10812 Keystone Bnd?

Yes. Nearby filings include 10705 Keystone Bnd (*partial demolition* eplan: residential expedited review - addition and remodel to existing 2-story single family res. [4bed 2.5bath] work to include: first floor remodel partial demolition to existing dinning room to create new bed [5bed 2.5bath], Aug 27, 2026); 10806 Keystone Bnd (install disconnect for water heater, Dec 11, 2025); 10803 Keystone Bnd (replace two feet of main sewer pipe that services all of upstairs. on bottom floor will need a 3x3 hole through slab to expose, Sep 3, 2025).

How do I get alerts for new permits at 10812 Keystone Bnd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78750
Email me when a new permit is filed