10903 Spicewood Pkwy
Austin, TX 78750
Main sewer line replacement at 10903 Spicewood Pkwy
A main sewer line is being replaced from beneath the house to the city tap at 10903 Spicewood Pkwy. The City of Austin permit record, dated August 14, 2025, says the tap is beneath the driveway and does not need to be moved.
Summarized from City of Austin records · updated Aug 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2025
- since Aug 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace main sewer line from 2ft under house out to city tap. note-city tap is under driveway called and spoke to austin water utility permitting office spoke to eli city does not require city tap to be moved
- AppliedAug 13, 2025
- IssuedAug 14, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 29, 2025
Passed final inspection Aug 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace main sewer line from 2ft under house out to city tap. note-city tap is under driveway called and spoke to austin water utility permitting office spoke to eli city does not require city tap to be moved
Replace main sewer line from 2ft under house out to city tap. note-city tap is under driveway called and spoke to austin water utility permitting office spoke to eli city does not require city tap to be moved
City of Austin permitPlumbing PermitFinal- Record
- 2025-102719 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10903 Spicewood Pkwy
What work is happening at 10903 Spicewood Pkwy?
A City of Austin plumbing permit describes replacing the main sewer line from 2 feet under the house to the city tap. The permit record is dated August 14, 2025.
Is a new home being built at 10903 Spicewood Pkwy?
The available permit is for sewer line replacement, not new home construction. It is permit 2025-102719 PP, with a final status.
When was the sewer line replacement permitted?
The City of Austin record for permit 2025-102719 PP is dated August 14, 2025.
Does the city tap need to be moved at 10903 Spicewood Pkwy?
The permit description says the city tap is beneath the driveway and that Austin Water Utility permitting staff indicated it does not need to be moved.
What is permit 2025-102719 PP for?
It is a City of Austin plumbing permit for replacing the main sewer line from beneath the house to the city tap. Its status is listed as final.
Also being built nearby
All of 78750- 11100 Chateau HillDec 18, 2025Rebuilding home after fire damage. adding one bathroom adding a master suite and extending kitchen · 66 m away
- 10900 Spicewood PkwyDec 22, 2025Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 10904 Chateau HillJan 26, 2026Sewer line replacement under home about 25 feet under kitchen area with 1 access hole · 79 m away
- 10810 Spicewood PkwyJan 8, 2025Interior remodel opening up walls from kitchen and dining room to living room. change of configuration of bedrooms on main floor to primary suite. replacement/new windows. no change to exterior of the structure the room chantes will be within existing attic · 90 m away
- 10907 Chateau HillAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 9518 Topridge DrAug 27, 2026Replacing 21 windows same size for size · 115 m away
- 10905 Chateau HillJan 24, 2025Express: kitchen/bathroom remodel plumbing fixture replacement exempt work (flooring cabinets etc) · 121 m away
- 10903 Chateau HillJul 24, 2024Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 11000 Spicewood PkwySep 8, 2026Express: replacement of 23 windows (like for like) · 133 m away
- 11105 Chateau HillApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 11100 Wintergreen HillMar 3, 2026Interior remodel remove (1) the partial wall circulating the oval dinning room to make it open to hallway and the living room; (2) the partial wall between the hallway and the living room; and (3) replace one (1) door and two (2) windows with a sliding door to the covered patio in the back yard · 145 m away
- 10710 Keystone BndMay 15, 2026Replacement of complete existing central heat and air system with or without duct work · 152 m away
More offices in 78750.