10905 Keystone Bnd
Austin, TX 78750
10905 Keystone Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 10905 Keystone Bnd, Austin, TX 78750. The most recent, filed June 20, 2025, covers: “Replacement of an existing water heater replace electric water heater”.
Compiled from City of Austin records · updated Jun 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2025
- since Jun 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replace electric water heater
- AppliedJun 17, 2025
- IssuedJun 20, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater replace electric water heater
Replacement of an existing water heater replace electric water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-075699 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10905 Keystone Bnd
What is being built at 10905 Keystone Bnd?
The latest filing (City of Austin permit 2025-075699 PP, June 20, 2025) covers replacement of an existing water heater replace electric water heater.
How many permits and filings does 10905 Keystone Bnd have?
1 filing across 1 project, from June 20, 2025 to June 20, 2025.
Is there other construction near 10905 Keystone Bnd?
Yes. Nearby filings include 10708 Keystone Bnd (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Jul 31, 2026); 10704 Ashton Cv (core brick inside fireplace to run 1/2 gas line to the outside wall up to 5ft mount to brick with new gas shutoff valve and connect to propane tank, Dec 23, 2024); 10710 Keystone Bnd (replacement of complete existing central heat and air system with or without duct work, May 15, 2026).
How do I get alerts for new permits at 10905 Keystone Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10708 Keystone BndJul 31, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 1 m away
- 10704 Ashton CvDec 23, 2024Core brick inside fireplace to run 1/2 gas line to the outside wall up to 5ft mount to brick with new gas shutoff valve and connect to propane tank · 66 m away
- 10710 Keystone BndMay 15, 2026Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 11002 Wintergreen HillJul 18, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 10807 Chateau HillDec 18, 2023Express cosmetic kitchen remodel remove & replace all fixtures updated electrical & new stove hood · 107 m away
- 10903 Chateau HillJul 24, 2024Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 10905 Chateau HillJan 24, 2025Express: kitchen/bathroom remodel plumbing fixture replacement exempt work (flooring cabinets etc) · 113 m away
- 10700 Ashton CvMay 10, 2024Replacing 200 amp exterior main panel · 128 m away
- 10907 Chateau HillAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 11001 Wintergreen HillSep 11, 2026Replacement of an existing water heater **brian ferguson: replace existing 40-gallon water heater located in garage closet; no structural change · 129 m away
- 10815 Wintergreen HillNov 15, 2024Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 10904 Chateau HillJan 26, 2026Sewer line replacement under home about 25 feet under kitchen area with 1 access hole · 163 m away