10912 Tall Oak Trl
Austin, TX 78750
Irrigation and HVAC work permitted at 10912 Tall Oak Trl
City of Austin records show an irrigation system installation at this residential address, filed June 1, 2026, under permit 2026-067042 PP. An earlier permit, filed February 21, 2025, covers replacement of the existing central heat and air system; both permits are marked Final.
Summarized from City of Austin records · updated Jun 1, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 1, 2026
- since Feb 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew install with dc irrigation system
- AppliedMay 27, 2026
- IssuedJun 1, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 18, 2026
Passed final inspection Jun 18, 2026.
Permit & project history
2 projectsNew install with dc irrigation system
New install with dc irrigation system
City of Austin permitPlumbing PermitFinal- Record
- 2026-067042 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-015967 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10912 Tall Oak Trl
What work is permitted at 10912 Tall Oak Trl?
Austin permit records list an irrigation system installation and replacement of the existing central heat and air system. Both permits are marked Final.
When was the irrigation permit filed at 10912 Tall Oak Trl?
The City of Austin filed plumbing permit 2026-067042 PP on June 1, 2026. Its description says “New install with dc irrigation system,” and its status is Final.
Was a new house permitted at 10912 Tall Oak Trl?
The records provided do not list a new-home permit. They show permits for an irrigation system installation and replacement of the existing central heat and air system.
When was the HVAC replacement permitted at 10912 Tall Oak Trl?
Mechanical permit 2025-015967 MP was filed February 21, 2025, for replacement of the complete existing central heat and air system. Its status is Final.
Are the permits at 10912 Tall Oak Trl final?
Yes. The City of Austin records list both permit 2026-067042 PP and permit 2025-015967 MP as Final.
Also being built nearby
All of 78750- 11004 Alison Parke TrlFeb 5, 2009The parke at anderson mill, amended plat of lots 4 & 5 blk a — the parke at anderson mill, amended plat of lots 4 & 5 blk a · 100 m away
- 11012 Alison Parke TrlJun 8, 2026Express: remove and replace 2 windows: like for like no structural changes · 132 m away
- 10804 Calcite TrlAug 12, 2026Replacement of complete existing central heat and air system with or without duct work 4 ton condenser change-out including indoor coil & 88k btus furnace change-out · 156 m away
- 11101 Sandstone TrlMay 13, 2026Replacement of complete existing central heat and air system with or without duct work · 181 m away
- 11023 Hard Rock RdSep 3, 2024Express: replace tub/shower with acrylic shower base and walls replace valves and fixtures · 184 m away
- 11113 Alison Parke TrlJan 17, 2025Replacement of an existing water heater · 188 m away
- 10903 Opal TrlDec 12, 2023Replacement of complete existing central heat and air system with or without duct work · 194 m away
- 10802 Thicket TrlAug 7, 2025New irrigation system · 194 m away
- 10801 Calcite TrlApr 8, 2024Replacement of complete existing central heat and air system with or without duct work · 205 m away
- 11109 Sandstone TrlAug 26, 2026Express: foundation repair · 207 m away
- 11531 Sandy Loam TrlJan 10, 20257.47 kw pv residential roof mounted solar system with battery backup system. installing 18- 415 qcell solar panels + 1 tesla powerwall 3 dc battery with built in 11.5 kw inverter · 228 m away
- 10803 Opal TrlOct 31, 2024Replacement of complete existing central heat and air system with or without duct work · 238 m away