11307 Pickfair Dr
Austin, TX 78750
Level 2 EV charger permitted at 11307 Pickfair Dr
A Level 2 EV charger was permitted at 11307 Pickfair Dr in Austin on July 27, 2026. The property also had an electrical service upgrade permitted on April 3, 2024; both City of Austin permits are marked final.
Summarized from City of Austin records · updated Jul 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 27, 2026
- since Apr 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJul 23, 2026
- IssuedJul 27, 2026
- WorkJul '26 – Jan '27
- Final inspectionJul 28, 2026
Passed final inspection Jul 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-095499 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade of existing electrical service
Upgrade of existing electrical service
City of Austin permitElectrical PermitFinal- Record
- 2024-036911 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11307 Pickfair Dr
What work was permitted at 11307 Pickfair Dr?
City of Austin records show a Level 2 EV charger installation and an upgrade to the existing electrical service. Both permits are marked final.
When was the EV charger permitted at 11307 Pickfair Dr?
The City of Austin issued electrical permit 2026-095499 EP on July 27, 2026, for a Level 2 EV charger installation. Its status is final.
Was a new home permitted at 11307 Pickfair Dr?
The records provided show electrical work, not a new home construction permit. The listed work includes an electrical service upgrade and a Level 2 EV charger installation.
Was the electrical service upgraded at 11307 Pickfair Dr?
Yes. City of Austin electrical permit 2024-036911 EP, dated April 3, 2024, describes an upgrade of the existing electrical service. Its status is final.
What is the latest permit for 11307 Pickfair Dr?
The latest listed permit is 2026-095499 EP, dated July 27, 2026. It covers installation of a Level 2 EV charger and is marked final.
Also being built nearby
All of 78750- 11306 Pickfair DrSep 29, 2026Addn to existing sq ft residence to create bdrm · 52 m away
- 11302 Pickfair DrOct 28, 2025Replacement of complete existing central heat and air system with or without duct work located in attic · 63 m away
- 11303 Pickfair DrJan 2, 2025Replacement of an existing water heater 50gal gas water heater changeout · 64 m away
- 10413 Weller DrAug 1, 2025Emergency repair: replacing 200a main circuit breaker that is not functioning in pec pedestal · 94 m away
- 11400 Pickfair DrApr 28, 2025Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 10409 Weller DrJul 1, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 10415 Weller DrApr 16, 2026Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 11203 Taterwood DrNov 4, 2025Install new 8.500 kw rooftop solar system and 13.5kw energy storage system for existing residential only · 125 m away
- 11402 Pickfair DrSep 9, 2026Panel upgrade · 132 m away
- 11200 Taterwood DrJun 23, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage gas horizontal system · 160 m away
- 11310 Spicewood Club DrOct 23, 2025Express - replacing 10 windows and 1 door like for like · 172 m away
- 11203 Pickfair DrNov 5, 2024New inground swimming pool and spa with reqd enclosure device for existing 1-story single family residence · 180 m away