11408 Spicewood Pkwy
Austin, TX 78750
11408 Spicewood Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 11408 Spicewood Pkwy, Austin, TX 78750. The most recent, filed September 10, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Sep 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2025
- since Sep 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedSep 5, 2025
- IssuedSep 10, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 12, 2025
Passed final inspection Sep 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-112804 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11408 Spicewood Pkwy
What is being built at 11408 Spicewood Pkwy?
The latest filing (City of Austin permit 2025-112804 EP, September 10, 2025) covers install evse.
How many permits and filings does 11408 Spicewood Pkwy have?
1 filing across 1 project, from September 10, 2025 to September 10, 2025.
Is there other construction near 11408 Spicewood Pkwy?
Yes. Nearby filings include 11502 Spicewood Pkwy (200amp panel 200amp meter base grounding and bonding, Apr 24, 2026); 11405 Spicewood Pkwy (the tunnel main drain line is 30lf and the sewer yard line replacement, Jul 17, 2024); 11801 Balcones Way (replacement of an existing water heater replacing a 50 gal electric water heater, Feb 10, 2025).
How do I get alerts for new permits at 11408 Spicewood Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 11502 Spicewood PkwyApr 24, 2026200amp panel 200amp meter base grounding and bonding · 65 m away
- 11405 Spicewood PkwyJul 17, 2024The tunnel main drain line is 30lf and the sewer yard line replacement · 90 m away
- 11801 Balcones WayFeb 10, 2025Replacement of an existing water heater replacing a 50 gal electric water heater · 98 m away
- 11506 Spicewood PkwyJan 24, 2024Replace sewer yard line · 130 m away
- 11806 Balcones WayNov 18, 2024New construction accessory to primary use 1-story pool house: sitting room with 1 bath and covered front porch · 143 m away
- 11401 Spicewood PkwyFeb 11, 2025Emergency pec disconnect replaced damaged material. meter riser and panel · 148 m away
- 9501 Cedar Crest DrSep 11, 2024Replace service mast meter and main panel · 148 m away
- 11304 Spicewood PkwyNov 9, 2026Replacement of complete existing central heat and air system with or without duct work like for like 5t horizontal heatpump · 157 m away
- 9410 Spring Hollow DrFeb 27, 2024Replacement of complete existing central heat and air system with or without duct work · 167 m away
- 9412 Spring Hollow DrSep 23, 2025Service replacement · 175 m away
- 11509 Spicewood PkwyMay 27, 2025New install irrigation · 175 m away
- 9407 Spring Hollow DrOct 30, 2025Addition of covered porch and renovation of existing bath 335 sq ft covered patio addition · 230 m away