EV charger and solar battery system permitted in Austin

City of Austin permits indicate an EV charger and a 9.32 kW DC solar system with 10.0 kWh of energy storage at this residence. Both electrical permits were filed June 27, 2025, and are listed as final.

Summarized from City of Austin records · updated Jun 27, 2025

Projects
2
2 filings
Latest filing
Jun 27, 2025
since Jun 27, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install ev charger

  1. AppliedJun 25, 2025
  2. IssuedJun 27, 2025
  3. WorkJun '25 – Jul '25
  4. Final inspectionJul 7, 2025

Passed final inspection Jul 7, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install ev charger

    Install ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 9.32 kw dc solar & 10.0 kwh ess

    9.32 kw dc solar & 10.0 kwh ess

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11608 Brandon Parke Trl

What is being installed at 11608 Brandon Parke Trl?

City of Austin permits describe an EV charger and a 9.32 kW DC solar system with 10.0 kWh of energy storage. The permits were filed June 27, 2025.

Is there a solar installation planned at this Austin address?

A City of Austin electrical permit records a 9.32 kW DC solar system and 10.0 kWh energy storage system. Permit 2025-079326 EP was filed June 27, 2025, and is listed as final.

Is an EV charger being installed at 11608 Brandon Parke Trl?

A City of Austin electrical permit describes an EV charger installation. Permit 2025-079318 EP was filed June 27, 2025, and is listed as final.

When were the solar and EV charger permits filed?

Both City of Austin permits were filed June 27, 2025. The EV charger permit is 2025-079318 EP, and the solar and energy storage permit is 2025-079326 EP.

What do the permits say about the battery system?

Permit 2025-079326 EP describes a 10.0 kWh energy storage system alongside a 9.32 kW DC solar installation. It was filed June 27, 2025, and is listed as final.