11801 Tanglebriar Trail
Austin, TX 78750 · Round Rock Independent School District
Purple Sage Elementary School renovations in Austin
Renovations are planned at Purple Sage Elementary School at 11801 Tanglebriar Trail in Austin. A TDLR project registration filed February 16, 2026, describes new corridor and classroom flooring, restroom fixture and floor replacements, a theatrical curtain, and reroofing of low-slope roofs. The applicant's estimated project cost is $5.9 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2026
- since Feb 16, 2026
- Largest scope
- 40,000 sf
- Estimated cost
- $5.9M
- state registration
Where this project stands
Finishing up · inspection nextPurple Sage Elementary School Renovations
40,000 sq ft · $5.9M est.
- RegisteredFeb 16, 2026
- Plan review
- ConstructionJun '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 14, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplacement of finish floors in all corridors and classrooms, replacement of fixtures and finish floors at select restrooms, addition of a theatrical curtain at the stage platform, reroofing of all low slope roofs — purple sage elementary school
TDLR project registrationRenovation/AlterationReview Complete40,000 sq ft$5.9M est.- Project #
- TABS2026012656
- Tenant / owner
- Purple Sage Elementary School Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11801 Tanglebriar Trail
What is being built at 11801 Tanglebriar Trail?
A renovation project is registered for Purple Sage Elementary School. The work includes flooring, select restroom fixtures and floors, a theatrical curtain, and reroofing.
What renovations are planned at Purple Sage Elementary School?
The registration describes replacing finish floors in corridors and classrooms, replacing fixtures and flooring in select restrooms, adding a theatrical curtain at the stage platform, and reroofing all low-slope roofs.
When was the Purple Sage Elementary School project filed?
The TDLR project registration was filed February 16, 2026. Its project number is TABS2026012656.
How much will the Purple Sage Elementary School renovations cost?
The applicant's estimated cost for the project is $5.9 million. This is an estimate, not a reported final cost.
How large is the Purple Sage Elementary School renovation project?
The TDLR registration lists a project size of 40,000 square feet.
What is the status of the Purple Sage Elementary School project?
The TDLR registration lists the status as Review Complete. It does not state when construction will begin or finish.
Also being built nearby
All of 78750- 11713 Tanglebriar TrlMay 16, 2024Express: kitchen/bathroom remodel remove/replace fixtures window replacement (like for like) · 31 m away
- 11801 Tanglebriar TrlJul 9, 2026Renovations to existing public elementary school including finishes reroofing plumbing fixtures hvac envelope sealing new theatre curtain at stage and replacement of outdated fire alarm system components. rrisd - fees waived · 105 m away
- 11708 Birchbark TrlSep 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 119 m away
- 11711 Birchbark TrlApr 23, 2024Repair to sewerline under building via tunnel · 124 m away
- 11703 Tanglebriar TrlOct 14, 2024Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 11723 FM 620 RdJun 22, 2026Red oaks · 142 m away
- 11909 Aloe Vera TrlOct 17, 2025Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 166 m away
- 11725 FM 620 RdJan 29, 2009620 hill country center, block a, amended plat of lots 5 & 6 — 620 hill country center, block a, amended plat of lots 5 & 6 · 192 m away
- 11701 N FM 620 RdAug 27, 2025Replacement of any self-contained packaged units · 195 m away
- 11723 N FM 620 RdFeb 11, 2026New outdoor swimming pool · 195 m away
- 11723 N FM 620 Road · Htg Anderson LLCJan 29, 2024Red oaks — new construction — red oaks apartments the program includes 70 dwelling units of three (3) unit types (1,2 & 3 bedroom), split slab foundation with an integral clubhouse, and private balconies with aluminum railings · 195 m away
- 11700 Aloe Vera CvNov 10, 2026Interior remodel- replacing an undersized (2) 2x12 load-bearing beam between the kitchen and dining room. installing a new beam consisting of (3) 1-3/4 by 11-7/8 lvls supported by a minimum of (3) bearing studs at each end to support the primary bedroom floor above per the attached structural engineers report · 196 m away