11913 Acorn Creek Trl
Austin, TX 78750
Permits cover an EV charger and breaker replacement
Austin permits at 11913 Acorn Creek Trl cover installation of EVSE and replacement of the main breaker in a meter pedestal. The EVSE permit was filed August 21, 2025, and the breaker permit was filed September 15, 2025; both are listed as final.
Summarized from City of Austin records · updated Sep 15, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 15, 2025
- since Aug 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPec outage - replace main breaker in meter pedestal
- AppliedSep 12, 2025
- IssuedSep 15, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 25, 2025
Passed final inspection Sep 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsPec outage - replace main breaker in meter pedestal
Pec outage - replace main breaker in meter pedestal
City of Austin permitElectrical PermitFinal- Record
- 2025-116115 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-104265 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11913 Acorn Creek Trl
What work was permitted at 11913 Acorn Creek Trl?
Austin issued permits for EVSE installation and replacement of the main breaker in a meter pedestal. Both permits are listed as final.
Was an EV charger permitted at 11913 Acorn Creek Trl?
An Austin electrical permit for EVSE installation was filed August 21, 2025 (permit 2025-104265 EP). The record is listed as final.
When was the meter-pedestal breaker replacement permitted?
The permit was filed September 15, 2025, as Austin permit 2025-116115 EP. Its description says the main breaker was replaced following a PEC outage.
Is a new building being built at 11913 Acorn Creek Trl?
The records provided describe electrical work: EVSE installation and replacement of a meter-pedestal main breaker. They do not describe construction of a new building.
Are the permits for 11913 Acorn Creek Trl complete?
Both Austin electrical permits are listed with final status: permit 2025-104265 EP for EVSE installation and permit 2025-116115 EP for the breaker replacement.
Also being built nearby
All of 78750- 11009 El Salido PkwyMay 30, 2024The plumber to add additional ng plumbing to fuel the generator · 92 m away
- 12001 Acorn Creek TrlJul 7, 2026Replacement of an existing water heater 40 gallon natural gas water heater replacement · 94 m away
- 11913 Wander LnSep 12, 2025Replacement of complete existing central heat and air system with or without duct work hvac replacement like for like · 104 m away
- 11001 El Salido PkwyNov 1, 2024Install gas pipe for generator · 108 m away
- 11901 Acorn Creek TrlJun 4, 2025Amnesty co for sfr · 122 m away
- 12002 Grey Fawn PathAug 13, 2026120amp panel replacement. no meter work. austin electric is the electrical provider · 140 m away
- 11805 Acorn Creek TrlJan 4, 2025Replacement of complete existing central heat and air system with or without duct work replacement of hvac like for like · 162 m away
- 11811 Buggy Whip TrlOct 16, 2025Adding new master bedroom over existing garage and bathroom ****partial demolition · 173 m away
- 11014 Hard Rock RdJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 176 m away
- 11211 Iron Oak TrlJul 22, 2025Replacement of complete existing central heat and air system with or without duct work garage mechanical closet · 182 m away
- 12007 Wander LnAug 1, 2025Emergency to repair conduit between pec meter/pedestal service disconnect and the panel on the house that was hit by others. no meter or other work done. pec disconnect replacing all damaged equipment · 184 m away
- 12005 Grey Rock LnOct 2, 2025Upgrading main panel and sub panel and upgrading breakers installing light fixtures repairing laundry room light fixtures replace bedroom fan and switch demolition old smoke detectors and old communication lines · 187 m away