12400 Mellow Meadow Dr
Austin, TX 78750
Westwood High School classroom and library remodels
May 2025 Austin permits indicate small interior remodels at Westwood High School, including plumbing and a door added to a classroom. Other permits describe creating a separate room in the library, accessed by the computer lab.
Summarized from City of Austin records · updated May 28, 2025
- Projects
- 10
- 10 filings
- Latest filing
- May 28, 2025
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSmall interior remodel to add plumbing and door to classroom
- AppliedFeb 5, 2025
- IssuedMay 28, 2025
- WorkMay '25 – Jul '25
- Final inspectionJul 9, 2025
Passed final inspection Jul 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
10 projectsSmall interior remodel to add plumbing and door to classroom
Small interior remodel to add plumbing and door to classroom
City of Austin permitElectrical PermitFinal- Record
- 2025-020368 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Small interior remodel to add plumbing and door to classroom
Small interior remodel to add plumbing and door to classroom
City of Austin permitPlumbing PermitFinal- Record
- 2025-020368 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Small interior remodel to provide separate room in library accessed by computer lab
Small interior remodel to provide separate room in library accessed by computer lab
City of Austin permitElectrical PermitFinal- Record
- 2025-009281 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Small interior remodel to provide separate room in library accessed by computer lab
Small interior remodel to provide separate room in library accessed by computer lab
City of Austin permitMechanical PermitFinal- Record
- 2025-009281 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Small interior remodel to provide separate room in library accessed by computer lab
Small interior remodel to provide separate room in library accessed by computer lab
City of Austin permitBuilding PermitExpired- Record
- 2025-009281 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Small interior remodel to add plumbing and door to classroom
Small interior remodel to add plumbing and door to classroom
City of Austin permitBuilding PermitFinal- Record
- 2025-020368 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12400 Mellow Meadow Dr
What is being built at 12400 Mellow Meadow Dr?
Austin permits filed in May 2025 describe small interior remodels at Westwood High School: plumbing and a door for a classroom, plus a separate room in the library accessed by the computer lab.
Is Westwood High School getting a new classroom?
The permits describe a small classroom remodel to add plumbing and a door, not construction of a new classroom. The related building permit, 2025-020368 BP, was filed May 3, 2025, and is marked final.
What work is planned for the Westwood High School library?
Permits filed May 5, 2025, describe an interior remodel to provide a separate room in the library, accessed by the computer lab. The related building permit, 2025-009281 BP, is marked expired.
When were the Westwood High School remodel permits filed?
The classroom building permit was filed May 3, 2025, and related plumbing and electrical permits were filed May 5 and May 28. Library remodel permits were filed May 3 and May 5, 2025.
Are the Westwood High School permits final?
The classroom building, plumbing, and electrical permits are marked final. The library building permit is marked expired; its electrical and mechanical permits are also listed in the records.
Has Westwood High School had other approved site plans?
Austin records include approved and released site plans for Westwood High School, including a main school site revision approved in 2023 and a fine arts addition case from 2007.
Also being built nearby
All of 78750- 12400 Mellow Meadow · Round Rock ISDDec 20, 2024Westwood cte renovation - health sciences — renovation/alteration — replacement of casework and flooring, repaint; adding plumbing, operable window, cubicle curtains and a door · 103 m away
- 12309 Old Stage TrlSep 17, 2026Sewer service replacement · 177 m away
- 12310 Old Stage CvMar 30, 2026Service upgrade to existing meter · 178 m away
- 12301 Hickorystick CvMay 2, 2025Excavate 25 tunnel to repair main drain line under the house. tunneling under the foundation. the drain line repair is for one bathroom. no sheetrock removal. the access hole is located is located in the front yard on the left side of the house · 183 m away
- 12303 Hickorystick CvJul 30, 2024Like for like replacement of natural gas water heater · 187 m away
- 12403 Mellow Meadow DrJan 26, 2026***timed virtual inspection: 01/27/2025 @ 10 am*** replacement of complete existing central heat and air system with or without duct work · 193 m away
- 12228 Old Stage TrlFeb 13, 2026Replace entire main line from city tap to clean out · 261 m away
- 12308 Bainbridge LnFeb 7, 2025Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 277 m away
- 12304 Bainbridge LnJul 4, 2024Interior remodel and wants to add a gable · 284 m away
- 12205 Double Tree LnJun 4, 2026Replacement of complete existing central heat and air system with or without duct work 4-ton condenser change-out & 88k btu furnace change-out · 313 m away
- 12217 Wallingstone LnNov 17, 2023Replacement of an existing water heater · 329 m away
- 12515 Mellow Meadow DrAug 27, 2008Rrisd westwood high school tennis courts and practice fields · 335 m away