2013 Verbena Dr
Austin, TX 78750
HVAC and water heater replacements permitted at 2013 Verbena Dr
Austin permits indicate replacement of the existing central heating and air system and water heater at 2013 Verbena Dr. The mechanical permit for a new Lennox 3-ton system was filed October 22, 2025, and the plumbing permit for a one-for-one water heater swap was filed November 17, 2025.
Summarized from City of Austin records · updated Nov 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 17, 2025
- since Oct 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 1 for 1 wh swap out
- AppliedNov 13, 2025
- IssuedNov 17, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 20, 2025
Passed final inspection Nov 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater 1 for 1 wh swap out
Replacement of an existing water heater 1 for 1 wh swap out
City of Austin permitPlumbing PermitFinal- Record
- 2025-145969 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work replacing old unit with new lennox 3 ton
Replacement of complete existing central heat and air system with or without duct work replacing old unit with new lennox 3 ton
City of Austin permitMechanical PermitFinal- Record
- 2025-133923 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2013 Verbena Dr
What work was permitted at 2013 Verbena Dr?
Austin permits cover replacement of the existing central heating and air system and a one-for-one water heater replacement.
When was the HVAC replacement permit filed at 2013 Verbena Dr?
The mechanical permit, 2025-133923 MP, was filed October 22, 2025. Its description specifies a replacement Lennox 3-ton system.
When was the water heater replacement permitted at 2013 Verbena Dr?
The plumbing permit, 2025-145969 PP, was filed November 17, 2025, for a one-for-one water heater swap.
Is a new building being constructed at 2013 Verbena Dr?
The records provided describe replacements to existing heating, air conditioning, and water-heating equipment, not construction of a new building.
What does permit 2025-133923 MP cover in Austin?
The City of Austin mechanical permit filed October 22, 2025, describes replacing the existing central heat and air system with a Lennox 3-ton unit.
What does permit 2025-145969 PP cover in Austin?
The City of Austin plumbing permit filed November 17, 2025, describes a one-for-one replacement of the existing water heater.
Also being built nearby
All of 78750- 1083 Verbena DrOct 30, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton stage vertical gas system · 43 m away
- 1094 Verbena DrFeb 23, 2026Replacement of complete existing central heat and air system with or without duct work hvac replacement like for like · 60 m away
- 1072 Verbena DrJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 10911 El Salido PkwyNov 14, 2023Replacement of an existing water heater · 111 m away
- 12103 Grey Rock LnMay 1, 2026Upgrade existing service to 200 amps · 113 m away
- 2032 Verbena DrMar 28, 2025Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 1000 Solano DrJun 23, 2024Re-roof · 133 m away
- 12107 Grey Rock LnNov 16, 2023Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 12006 Grey Rock LnFeb 28, 2024Replacement of an existing water heater · 147 m away
- 12005 Grey Rock LnOct 2, 2025Upgrading main panel and sub panel and upgrading breakers installing light fixtures repairing laundry room light fixtures replace bedroom fan and switch demolition old smoke detectors and old communication lines · 160 m away
- 1000 Verbena DrMar 5, 2024Replacement of complete existing central heat and air system with or without duct work · 160 m away
- 1032 Verbena DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 166 m away