6311 Lakewood Holw
Austin, TX 78750
6311 Lakewood Holw: 1 project on record
City of Austin lists 1 filing across 1 project at 6311 Lakewood Holw, Austin, TX 78750. The most recent, filed February 3, 2025, covers: “Replace existing 200a panel with new 200a panel with main breaker”.
Compiled from City of Austin records · updated Feb 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2025
- since Feb 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit pendingReplace existing 200a panel with new 200a panel with main breaker
- AppliedJan 22, 2025
- IssuedFeb 3, 2025
- WorkFeb 3, 2025
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace existing 200a panel with new 200a panel with main breaker
Replace existing 200a panel with new 200a panel with main breaker
City of Austin permitElectrical PermitPending- Record
- 2025-007754 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6311 Lakewood Holw
What is being built at 6311 Lakewood Holw?
The latest filing (City of Austin permit 2025-007754 EP, February 3, 2025) covers replace existing 200a panel with new 200a panel with main breaker.
How many permits and filings does 6311 Lakewood Holw have?
1 filing across 1 project, from February 3, 2025 to February 3, 2025.
Is there other construction near 6311 Lakewood Holw?
Yes. Nearby filings include 6400 Paintbrush Holw (gas leak detected in underground black pipe. will repair with poly underground, Mar 9, 2026); 6308 Lakewood Holw (replacement of complete existing central heat and air system with or without duct work 3 ton vertical heat pump, Dec 16, 2024); 7208 Winecup Holw (replacement of electrical service with up to date service, Mar 2, 2026).
How do I get alerts for new permits at 6311 Lakewood Holw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 6400 Paintbrush HolwMar 9, 2026Gas leak detected in underground black pipe. will repair with poly underground · 40 m away
- 6308 Lakewood HolwDec 16, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical heat pump · 53 m away
- 7208 Winecup HolwMar 2, 2026Replacement of electrical service with up to date service · 61 m away
- 7300 Cave HolwOct 28, 2025Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 6408 Paintbrush HolwMar 12, 2024Replacement of an existing water heater · 85 m away
- 6413 Paintbrush HolwSep 9, 2025Level 2 ev charger powered by a 30amp circuit breaker. run #10 thhn c.u. & #14 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 24amp constant draw · 92 m away
- 7302 Cave HolwAug 5, 2025Replacement of an existing water heater · 93 m away
- 6208 Quail HolwJul 24, 2026Replacement of an existing water heater 40 gallon nat gas water heater replacement · 100 m away
- 6207 Quail HolwJul 16, 2025Gas line repair · 108 m away
- 7205 Winecup HolwOct 13, 2025Replace water yard line · 109 m away
- 7308 Cave HolwFeb 27, 20263x like for like window exchange. 1x casement 23.5inx35.5in 1x fixed sash set 35.5inx47.5in 1x fixed sash set 35.5inx35.5in. rear side of residential home (west facing). total 26.26 sq ft · 130 m away
- 7104 Coachwhip HolwNov 20, 2025Express- replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 134 m away