6900 Dogwood Holw
Austin, TX 78750
6900 Dogwood Holw: 1 project on record
City of Austin lists 1 filing across 1 project at 6900 Dogwood Holw, Austin, TX 78750. The most recent, filed March 1, 2024, covers: “Replace water line to repair leak”.
Compiled from City of Austin records · updated Mar 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 1, 2024
- since Mar 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace water line to repair leak
- AppliedFeb 29, 2024
- IssuedMar 1, 2024
- WorkMar '24 – Mar '24
- Final inspectionMar 22, 2024
Passed final inspection Mar 22, 2024.
1 contact on this project
Permit & project history
1 projectReplace water line to repair leak
Replace water line to repair leak
City of Austin permitPlumbing PermitFinal- Record
- 2024-025511 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6900 Dogwood Holw
What is being built at 6900 Dogwood Holw?
The latest filing (City of Austin permit 2024-025511 PP, March 1, 2024) covers replace water line to repair leak.
How many permits and filings does 6900 Dogwood Holw have?
1 filing across 1 project, from March 1, 2024 to March 1, 2024.
Is there other construction near 6900 Dogwood Holw?
Yes. Nearby filings include 6902 Dogwood Holw (install new 6.84 kw rooftop solar system to existing residential only using a backfed breaker, May 1, 2025); 6909 Dogwood Holw (***timed virtual inspection: 12/03/2025 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal electric heatpump system, Jun 9, 2025); 6900 Flamingsworth Holw (replacement of an existing water heater replace 40-gallon electric water heater located in hallway closet, Feb 11, 2026).
How do I get alerts for new permits at 6900 Dogwood Holw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 6902 Dogwood HolwMay 1, 2025Install new 6.84 kw rooftop solar system to existing residential only using a backfed breaker · 17 m away
- 6909 Dogwood HolwJun 9, 2025***timed virtual inspection: 12/03/2025 @ 1 pm*** replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal electric heatpump system · 70 m away
- 6900 Flamingsworth HolwFeb 11, 2026Replacement of an existing water heater replace 40-gallon electric water heater located in hallway closet · 74 m away
- 6911 Dogwood HolwJan 5, 2024Replace whole yard line on the front right side of the house to address ecv 2021 198444 · 85 m away
- 7005 Ridge HolwApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 6903 Flamingsworth HolwJun 5, 2024New residential irrigation system installation · 99 m away
- 7017 Ridge HolwMay 9, 2024Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 7010 Ridge HolwJun 21, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 7006 Firewheel HolwFeb 23, 2026Replacement of an existing water heater 40gal electric located in the garage · 159 m away
- 6912 Ridge HolwOct 28, 2026Base: installing a backup battery system and additional meter socket · 165 m away
- 6109 Gardenridge HolwSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 169 m away
- 6908 Ridge HolwMay 14, 2024Interior remodel: reconfigure kitchen dining and living room to create open concept powder bathroom remodel remove sliding glass door and replace with hinged door replace garage fire rated door new flush hearth all work limited to ground floor · 177 m away