groundranger
Active · latest filing Sep 2026Residential

7300 Anaqua Dr

Austin, TX 78750

Solar panels and an EV charger permitted at 7300 Anaqua Dr

Permits indicate solar panels and battery equipment are being added to the residential property at 7300 Anaqua Dr, along with a Level 2 EV charger. The latest solar permit was filed September 9, 2026, following permits for a 7.83 kW solar system and Tesla Powerwall 3 in September and November 2025.

Summarized from City of Austin records · updated Sep 9, 2026

Projects
4
4 filings
Latest filing
Sep 9, 2026
since Sep 30, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

**adding (10) mission solar energy llc msx10-435hn0b solar panels. in total will be installing a 4.35 kw pv system and (1) tesla inc. 1807000-xx-y. the customer has an existing system that consists of (18) mission solar energy llc msx10-435hn0b panels and (1) tesla inc. 1707000-xx-y inverter/battery

  1. AppliedJan 30, 2026
  2. IssuedSep 9, 2026
  3. WorkSep '26 – Sep '26
  4. Final inspectionSep 9, 2026

Passed final inspection Sep 9, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. **adding (10) mission solar energy llc msx10-435hn0b solar panels. in total will be installing a 4.35 kw pv system and (1) tesla inc. 1807000-xx-y. the customer has an existing system that consists of (18) mission solar energy llc msx10-435hn0b panels and (1) tesla inc. 1707000-xx-y inverter/battery

    **adding (10) mission solar energy llc msx10-435hn0b solar panels. in total will be installing a 4.35 kw pv system and (1) tesla inc. 1807000-xx-y. the customer has an existing system that consists of (18) mission solar energy llc msx10-435hn0b panels and (1) tesla inc. 1707000-xx-y inverter/battery

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Request to disconnect installing a 7.83 kw pv solar system and 1 tesla pw 3 we need to disconnect the power for the pw install

    Request to disconnect installing a 7.83 kw pv solar system and 1 tesla pw 3 we need to disconnect the power for the pw install

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Installing a 7.83 kw pv solar system and 1 tesla pw 3

    Installing a 7.83 kw pv solar system and 1 tesla pw 3

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7300 Anaqua Dr

What is being installed at 7300 Anaqua Dr?

City of Austin permits indicate solar panels, battery equipment and a Level 2 EV charger. The records describe both a 2025 solar system installation and a later addition to an existing system.

When was the latest solar permit filed for 7300 Anaqua Dr?

The latest listed solar permit, 2026-011851 EP, was filed September 9, 2026. It covers 10 additional solar panels and a 4.35 kW photovoltaic system.

Is a Tesla Powerwall being installed at 7300 Anaqua Dr?

A September 30, 2025 permit, 2025-122409 EP, describes installing a 7.83 kW solar system and a Tesla Powerwall 3. A November 18, 2025 permit covered disconnecting power for the installation.

Is there a permit for an EV charger at 7300 Anaqua Dr?

Yes. City permit 2026-033659 EP, filed March 20, 2026, is for installing a Level 2 EV charger.

How many solar panels are being added at 7300 Anaqua Dr?

The September 9, 2026 permit describes adding 10 solar panels to an existing system of 18 panels. It also lists a 4.35 kW photovoltaic system.

Are these permits for a new commercial building at 7300 Anaqua Dr?

The records classify the property as residential and list electrical permits for solar equipment and an EV charger. They do not describe a new commercial building.

Also being built nearby

All of 78750

More solar installs in 78750.

Email me when a new permit is filed