7304 Barley Cv
Austin, TX 78750
Reroof permit filed at 7304 Barley Cv
A reroof with no structural changes was permitted at 7304 Barley Cv on March 13, 2026. The City of Austin permit, 2026-030742 BP, is listed as final.
Summarized from City of Austin records · updated Mar 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 13, 2026
- since Mar 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: reroof with no structure changes
- AppliedMar 13, 2026
- IssuedMar 13, 2026
- WorkMar '26 – Apr '26
- Final inspectionApr 2, 2026
Passed final inspection Apr 2, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: reroof with no structure changes
Express: reroof with no structure changes
City of Austin permitBuilding PermitFinal- Record
- 2026-030742 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7304 Barley Cv
What work is planned at 7304 Barley Cv?
A City of Austin permit describes a reroof with no structural changes. It was filed March 13, 2026.
Is a new home being built at 7304 Barley Cv?
The permit record is for reroofing, not new home construction.
When was the reroof permit filed at 7304 Barley Cv?
The City of Austin filing date is March 13, 2026.
What is the permit number for work at 7304 Barley Cv?
The permit number is 2026-030742 BP. It covers an express reroof with no structural changes.
Is the 7304 Barley Cv permit approved?
The City of Austin record lists permit 2026-030742 BP as final.
Also being built nearby
All of 78750- 7405 Jester BlvdFeb 1, 2024200 amp underground service upgrade · 50 m away
- 7300 Barley CvJun 7, 2024Replacement of an existing water heater · 59 m away
- 7405 Teak CvSep 2, 2026Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 7401 Jester BlvdJan 31, 2024Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 7312 Foxtree CvMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 7404 Jester BlvdJun 2, 2025Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 7416 Anaqua DrMay 15, 2024Replace the existing main distribution panel with a new 125/125 exterior surface mount load center. run new thhn from the meter socket to the new main distribution panel. replace all the existing circuit breakers. no meter upgrade · 109 m away
- 7404 Teak CvAug 19, 2025Express: remove and replace 1 window and 1 door (like for like) · 110 m away
- 7406 Anaqua DrDec 8, 2023Upgrade main electrical service to 200 amp. install new 200 amp main breaker panel with updated grounding and surge protection · 113 m away
- 7501 Kolache CvNov 13, 2025Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 7500 Clematis CvOct 30, 2024Replacement of an existing water heater · 123 m away
- 7402 Anaqua DrAug 5, 2025Pool - construction of gunite swimming pool and concrete flatwork demolition of existing flatwork · 150 m away