7308 Bandera Ranch Trl
Austin, TX 78750
7308 Bandera Ranch Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 7308 Bandera Ranch Trl, Austin, TX 78750. The most recent, filed December 2, 2024, covers: “Ev install”.
Compiled from City of Austin records · updated Dec 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 2, 2024
- since Dec 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedNov 14, 2024
- IssuedDec 2, 2024
- WorkDec '24 – May '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2024-151912 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7308 Bandera Ranch Trl
What is being built at 7308 Bandera Ranch Trl?
The latest filing (City of Austin permit 2024-151912 EP, December 2, 2024) covers ev install.
How many permits and filings does 7308 Bandera Ranch Trl have?
1 filing across 1 project, from December 2, 2024 to December 2, 2024.
Is there other construction near 7308 Bandera Ranch Trl?
Yes. Nearby filings include 7316 Bandera Ranch Trl (replace prv in yard, Mar 1, 2024); 7313 Colina Vista Loop (replacement of an existing water heater replaced ng water heater, Oct 6, 2025); 7317 Bandera Ranch Trl (replacement of an existing water heater replace 2 ng water heaters, Jan 29, 2026).
How do I get alerts for new permits at 7308 Bandera Ranch Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 7316 Bandera Ranch TrlMar 1, 2024Replace prv in yard · 31 m away
- 7313 Colina Vista LoopOct 6, 2025Replacement of an existing water heater replaced ng water heater · 34 m away
- 7317 Bandera Ranch TrlJan 29, 2026Replacement of an existing water heater replace 2 ng water heaters · 45 m away
- 7316 Colina Vista LoopJan 21, 2026Installation of ev charger · 86 m away
- 7505 Colina Vista LoopMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage horizontal gas system · 88 m away
- 9713 Solana Vista LoopJan 30, 2024Replacement of an existing water heater · 97 m away
- 7300 Colina Vista LoopJun 27, 2024Replacement of an existing water heater · 98 m away
- 9725 Solana Vista LoopJan 30, 2024Replacement of an existing water heater · 100 m away
- 9705 Solana Vista LoopMay 13, 2026Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 7220 Colina Vista LoopMar 30, 2026Replacement of an existing water heater replaced 50g ng water heater in attic · 116 m away
- 7512 Colina Vista LoopJan 19, 2025Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 9701 Solana Vista LoopJun 3, 2026Tesla wall connector installation meter main combo feeds sub panel in garage. charger will be fed from sub panel in garage 60a circuit · 119 m away