7803 Ginkgo Cv
Austin, TX 78750
7803 Ginkgo Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 7803 Ginkgo Cv, Austin, TX 78750. The most recent, filed September 26, 2025, covers: “Installing circuit for ev charging”.
Compiled from City of Austin records · updated Sep 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2025
- since Sep 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling circuit for ev charging
- AppliedSep 19, 2025
- IssuedSep 26, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 7, 2025
Passed final inspection Oct 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstalling circuit for ev charging
Installing circuit for ev charging
City of Austin permitElectrical PermitFinal- Record
- 2025-119889 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7803 Ginkgo Cv
What is being built at 7803 Ginkgo Cv?
The latest filing (City of Austin permit 2025-119889 EP, September 26, 2025) covers installing circuit for ev charging.
How many permits and filings does 7803 Ginkgo Cv have?
1 filing across 1 project, from September 26, 2025 to September 26, 2025.
Is there other construction near 7803 Ginkgo Cv?
Yes. Nearby filings include 7805 Ginkgo Cv (interior remodel interior remodel to remove walls and remodel kitchen living room and study master bathroom replacing 3 bay windows with fix frosted glass update windows like for like three new windows are being added, Mar 18, 2024); 7801 Ginkgo Cv (car charger install, Oct 16, 2026); 7802 Nutmeg Cv (replacement of complete existing central heat and air system with or without duct work, Sep 10, 2026).
How do I get alerts for new permits at 7803 Ginkgo Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 7805 Ginkgo CvMar 18, 2024Interior remodel interior remodel to remove walls and remodel kitchen living room and study master bathroom replacing 3 bay windows with fix frosted glass update windows like for like three new windows are being added · 25 m away
- 7801 Ginkgo CvOct 16, 2026Car charger install · 31 m away
- 7802 Nutmeg CvSep 10, 2026Replacement of complete existing central heat and air system with or without duct work · 34 m away
- 7800 Ginkgo CvSep 14, 2026*partial demolition* interior remodel/partial garage conversion two-story sfr · 54 m away
- 7802 Ginkgo CvJan 23, 2026Express: single roof replacement (located in wui) · 69 m away
- 7900 Goldenrod CvJan 13, 2026Express: single replacement (located in wui) · 79 m away
- 7901 Bricklebush CvJul 18, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 7902 Goldenrod CvAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 7805 Nutmeg CvAug 2, 2024Express: siding replacement · 99 m away
- 8003 Asmara DrMay 6, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 103 m away
- 7801 Nutmeg CvJul 3, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system · 105 m away
- 8005 Asmara DrApr 29, 2026Replacement of complete existing central heat and air system with or without duct work · 110 m away