groundranger
Recent · latest filing Jul 2025Residential

8005 Bottlebrush Dr

Austin, TX 78750

Exterior elevator shaft permitted at Austin home

City of Austin permits indicate an exterior elevator shaft is being added at the rear left of the home at 8005 Bottlebrush Dr. The building permit was filed March 5, 2025, and an electrical permit for the same work followed on July 2, 2025; both are marked final.

Summarized from City of Austin records · updated Jul 2, 2025

Projects
5
5 filings
Latest filing
Jul 2, 2025
since Jul 1, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Add exterior elevator shaft on left rear of home

  1. AppliedNov 4, 2024
  2. IssuedJul 2, 2025
  3. WorkJul '25 – Jul '25
  4. Final inspectionJul 18, 2025

Passed final inspection Jul 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Add exterior elevator shaft on left rear of home

    Add exterior elevator shaft on left rear of home

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Add exterior elevator shaft on left rear of home

    Add exterior elevator shaft on left rear of home

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Repair damaged section of the sewer line

    Repair damaged section of the sewer line

    City of Austin permitPlumbing PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install new gas line from meter to generator

    Install new gas line from meter to generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. 24kw whole home generator (natural gas) with 150amp transfer switch connected to house meter and main panel. no meter can required. (craig skelton) request to disconnect

    24kw whole home generator (natural gas) with 150amp transfer switch connected to house meter and main panel. no meter can required. (craig skelton) request to disconnect

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8005 Bottlebrush Dr

What is being built at 8005 Bottlebrush Dr?

City of Austin permits describe an exterior elevator shaft being added at the left rear of the home. The records do not specify other details about the elevator.

When was the elevator shaft permitted at 8005 Bottlebrush Dr?

The building permit, 2025-024890 BP, was filed March 5, 2025. An electrical permit for the shaft, 2025-068371 EP, was filed July 2, 2025.

Are the permits for the elevator shaft final?

Yes. The City of Austin lists both the March 5, 2025 building permit and the July 2, 2025 electrical permit as final.

Is a new elevator being installed at 8005 Bottlebrush Dr?

The permit descriptions say an exterior elevator shaft is being added at the left rear of the home. They do not confirm whether an elevator itself is included.

What other work was permitted at 8005 Bottlebrush Dr?

A 2024 electrical permit covers a 24-kilowatt natural-gas whole-home generator, and a July 25, 2024 plumbing permit covers a new gas line from the meter to the generator. A sewer-line repair permit filed November 4, 2024, was withdrawn.

Also being built nearby

All of 78750
Email me when a new permit is filed