8112 Vailview Cv
Austin, TX 78750
Central heating and air system replacement at 8112 Vailview Cv
A permit filed September 3, 2026, covers replacement of the existing central heating and air system at 8112 Vailview Cv. The work specifies a York 3.5-ton, 14 SEER2 cooling system and gas furnace, with or without duct work; permit 2026-113988 MP is marked final.
Summarized from City of Austin records · updated Sep 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2026
- since Sep 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 1 system: york 3.5 ton 14 seer2 straight cool system gas furnace
- AppliedAug 31, 2026
- IssuedSep 3, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 21, 2026
Passed final inspection Sep 21, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 1 system: york 3.5 ton 14 seer2 straight cool system gas furnace
Replacement of complete existing central heat and air system with or without duct work 1 system: york 3.5 ton 14 seer2 straight cool system gas furnace
City of Austin permitMechanical PermitFinal- Record
- 2026-113988 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8112 Vailview Cv
What work is permitted at 8112 Vailview Cv in Austin?
A City of Austin mechanical permit covers replacing the existing central heat and air system. The permit was filed September 3, 2026.
Is a new house being built at 8112 Vailview Cv?
The record is for replacement of an existing central heating and air system, not a new-house construction permit.
What kind of HVAC system is being installed at 8112 Vailview Cv?
The permit specifies a York 3.5-ton, 14 SEER2 straight-cool system with a gas furnace. It allows for work with or without duct work.
When was the HVAC permit filed for 8112 Vailview Cv?
The City of Austin permit was filed September 3, 2026. Its number is 2026-113988 MP.
Is the permit for 8112 Vailview Cv final?
Yes. City of Austin permit 2026-113988 MP is listed with final status.
Also being built nearby
All of 78750- 8035 Bottlebrush DrNov 6, 2026Base: installing a backup battery system and additional meter socket · 48 m away
- 8104 Vailview CvMay 27, 2025Install evse · 58 m away
- 8100 Vailview CvSep 22, 2025Interior remodel. remodeling kitchen stairs laundry room powder and master bath. updating finishes and appliances for the kitchen pantry master bath and powder room. replace flooring throughout · 101 m away
- 8101 Vailview CvAug 22, 2024Express: window replacement (13 windows like for like) large home no front windows · 118 m away
- 8125 Vailview CvAug 31, 2026Removal of the existing water heating system and the installation of a navien npe-240a2 condensing tankless water heater in the attic · 120 m away
- 8105 Bottlebrush DrMar 3, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 8020 Bottlebrush DrJan 3, 2025Interior remodel master bathroom remodel. relocate tub shower and toilet. abandon existing plumbing lines and install new. install new 200a outdoor panel with main breaker. remove one window in master bedroom relocate one window in master bathroom. relocate exterior door in living room. add exterior door in existing dining room. add interior walls and doors in existing dining room to create new pantry and dog wash room · 131 m away
- 8104 Bottlebrush DrJun 21, 2024Express: replace 39 windows and 1 entry door like for like · 134 m away
- 8013 Bottlebrush DrMar 11, 2026Express: replace existing windows (like for like) · 158 m away
- 8114 Bottlebrush DrNov 10, 2026Replace tankless water heater and water softener · 176 m away
- 8008 Bottlebrush DrMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 178 m away
- 8009 Bottlebrush DrNov 18, 2026Interior remodel of existing 2-story single family residence. remodel of kitchen and new pantry room. remodel of second floor bedrooms and bathroom. consists of demolition flooring and baseboards throughout stair flooring interior doors and trim throughout sink and toilet in powder - new fixtures to be installed in existing locations. sink and toilet in powder new fixtures to be installed in existing locations. new tub to be installed in existing location new tub to be installed in existing location new wall doors and windows · 184 m away