8905 Fairway Hill Dr
Austin, TX 78750
8905 Fairway Hill Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8905 Fairway Hill Dr, Austin, TX 78750. The most recent, filed January 31, 2025, covers: “Letcher - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps”.
Compiled from City of Austin records · updated Jan 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 31, 2025
- since Jan 31, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLetcher - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
- AppliedJan 14, 2025
- IssuedJan 31, 2025
- WorkJan '25 – Feb '25
- Final inspectionFeb 20, 2025
Passed final inspection Feb 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectLetcher - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
Letcher - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2025-004788 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8905 Fairway Hill Dr
What is being built at 8905 Fairway Hill Dr?
The latest filing (City of Austin permit 2025-004788 EP, January 31, 2025) covers letcher - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps.
How many permits and filings does 8905 Fairway Hill Dr have?
1 filing across 1 project, from January 31, 2025 to January 31, 2025.
Is there other construction near 8905 Fairway Hill Dr?
Yes. Nearby filings include 8901 Fairway Hill Dr (express: replace 2 windows and 1 door with no structural changes, Oct 28, 2026); 11504 Champion Dr (in ground swimming pool and spa with required enclosure device for existing sfr with concrete deck, Jan 8, 2024); 8805 Fairway Hill Dr (we will tunnel following the clean out 10 under the slab to expose the broken fitting on the toilet branch line. once exposed we will make a spot repair on the broken fitting and test the entire system again to confirm there are no additional leaks, Jun 17, 2026).
How do I get alerts for new permits at 8905 Fairway Hill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 8901 Fairway Hill DrOct 28, 2026Express: replace 2 windows and 1 door with no structural changes · 67 m away
- 11504 Champion DrJan 8, 2024In ground swimming pool and spa with required enclosure device for existing sfr with concrete deck · 83 m away
- 8805 Fairway Hill DrJun 17, 2026We will tunnel following the clean out 10 under the slab to expose the broken fitting on the toilet branch line. once exposed we will make a spot repair on the broken fitting and test the entire system again to confirm there are no additional leaks · 96 m away
- 8803 Fairway Hill DrNov 10, 2025Complete replacement of water line from meter to the home approximately 53 · 124 m away
- 11503 Champion DrAug 28, 2026Rebuilt old federal pacific service · 131 m away
- 8915 Fairway Hill DrJul 20, 2026Express: replacing windows and doors like for like and replacing whole roof and install gutter and exterior breaker box replacement and replacing kitchen cabinets and retile bathroom and replacing hvac condenser. replace the floor vinyl · 155 m away
- 8804 Spring Lake DrNov 13, 2026Replacement of an existing water heater change out of existing electric water heater like for like · 157 m away
- 8802 Spring Lake DrOct 3, 2025Replacement of an existing water heater · 176 m away
- 9002 Fairway Hill DrMay 27, 2025***timed virtual inspection: 11/17/2025 @10 am*** replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two-stage heat pump system · 211 m away
- 8900 Balcones Club DrNov 3, 2025Interior remodel porch reconstruction (removing post for covered porch and install new headers new sliding doors instead of double doors) rewiring wall removal and relocation (interior) kitchen stove and sink relocation and bathroom and closet renovations · 219 m away
- 11505 Highview DrApr 8, 2024Partial demolition to remove existing deck/pergola. new construction accessory use uncovered wood rear deck; new construction accessory use detached rear covered patio · 223 m away
- 8813 Balcones Club DrSep 11, 2026Two separate tunnels to repair the sanitary drainage. left side tunnel will repair the downstairs 1/2 bath laundry room kitchen drainage branch. the right side tunnel will repair the sewer drainage for the master bathroom group and upstairs sanitary stack. both drainage systems will extend into the front yard and combine into one primary gravity sewer line and connect to the city sewer tap · 224 m away
More solar installs in 78750.