9007 Middlebie Dr
Austin, TX 78750
9007 Middlebie Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9007 Middlebie Dr, Austin, TX 78750. The most recent, filed June 16, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jun 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2025
- since Jun 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedMay 21, 2025
- IssuedJun 16, 2025
- WorkJun '25 – Jun '25
- Final inspectionJun 23, 2025
Passed final inspection Jun 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-063183 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9007 Middlebie Dr
What is being built at 9007 Middlebie Dr?
The latest filing (City of Austin permit 2025-063183 PP, June 16, 2025) covers replacement of an existing water heater.
How many permits and filings does 9007 Middlebie Dr have?
1 filing across 1 project, from June 16, 2025 to June 16, 2025.
Is there other construction near 9007 Middlebie Dr?
Yes. Nearby filings include 9006 Middlebie Dr (express: replacing 14 windows (like for like), Aug 5, 2026); 9100 Westerkirk Dr (replacement of complete existing central heat and air system without duct work, Apr 4, 2024); 9102 Westerkirk Dr (replacement of complete existing central heat and air system with or without duct work no ductwork, Nov 26, 2025).
How do I get alerts for new permits at 9007 Middlebie Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 9006 Middlebie DrAug 5, 2026Express: replacing 14 windows (like for like) · 52 m away
- 9100 Westerkirk DrApr 4, 2024Replacement of complete existing central heat and air system without duct work · 65 m away
- 9102 Westerkirk DrNov 26, 2025Replacement of complete existing central heat and air system with or without duct work no ductwork · 86 m away
- 11122 Callanish Park DrApr 9, 2024Express replace siding by the right & left side and the chimney · 94 m away
- 11120 Callanish Park DrJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 9101 Westerkirk DrJun 5, 2026Express: tub and valve replacement · 99 m away
- 9105 Middlebie DrJul 12, 2026New pool and decking revision: description of revision: change access route and add tree remediation · 102 m away
- 10900 Low Bridge LnMay 30, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal heat-pump system · 145 m away
- 11121 Callanish Park DrNov 21, 2023(huang wei)- installation of circuit for elec. vehicle charging station-esip · 150 m away
- 11129 Callanish Park DrMay 29, 2025Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 9109 Westerkirk DrDec 15, 2023Not touching meter. replace main panel and shop sub panel · 175 m away
- 11135 Callanish Park DrSep 9, 20266 tunnel below the foundation to repair break on 4x2 wye with root intrusion on main. 1 access hole left side at clean out 5 tunnel below the foundation to spot repair master bathroom drain line via access hole on right side and 20 tunnel below to repair the hall bath drain line · 174 m away