9011 Mountain Lake Cir
Austin, TX 78750
9011 Mountain Lake Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 9011 Mountain Lake Cir, Austin, TX 78750. The most recent, filed July 1, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2024
- since Jul 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 1, 2024
- IssuedJul 1, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 10, 2024
Passed final inspection Jul 10, 2024.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-081679 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9011 Mountain Lake Cir
What is being built at 9011 Mountain Lake Cir?
The latest filing (City of Austin permit 2024-081679 MP, July 1, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 9011 Mountain Lake Cir have?
1 filing across 1 project, from July 1, 2024 to July 1, 2024.
Is there other construction near 9011 Mountain Lake Cir?
Yes. Nearby filings include 9013 Mountain Lake Cir (replace all cast iron pipes under slab with pvc, Feb 12, 2024); 9008 Mountain Lake Cir (not pre-plumbed water softener install, Jan 24, 2024); 9016 Mountain Lake Cir (replacing main panel (200 amps), Apr 11, 2024).
How do I get alerts for new permits at 9011 Mountain Lake Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 9013 Mountain Lake CirFeb 12, 2024Replace all cast iron pipes under slab with pvc · 34 m away
- 9008 Mountain Lake CirJan 24, 2024Not pre-plumbed water softener install · 68 m away
- 9016 Mountain Lake CirApr 11, 2024Replacing main panel (200 amps) · 77 m away
- 9020 Mountain Lake CirJun 6, 2025Emergency request. tree limb fell on wires and pulled service mast off the wall. repairs made and service ready to be reconnected by pec. need inspection · 106 m away
- 9012 Balcones Club DrApr 8, 2026Express: interior non structural remodel: see attached project narrative · 118 m away
- 9016 Balcones Club DrMay 28, 2026Wastewater tap and decommission existing septic tap info: 2026-066194 w · 144 m away
- 9004 Balcones Club DrMar 5, 2026Install disconnect in place of timer · 145 m away
- 9004 Fairway Hill DrSep 25, 2025*partial demolition* addition to two-story sfr · 192 m away
- 9004 Jolly Hollow DrJan 27, 2026Full service rebuild. will require disconnect and reconnect. pec is utility · 200 m away
- 9102 Spring Lake DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal heat pump system · 202 m away
- 9007 Spring Lake DrSep 5, 2025Enclose existing covered concrete patio to create sunroom · 215 m away
- 9002 Fairway Hill DrMay 27, 2025***timed virtual inspection: 11/17/2025 @10 am*** replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two-stage heat pump system · 225 m away