9108 Spring Lake Dr
Austin, TX 78750
9108 Spring Lake Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9108 Spring Lake Dr, Austin, TX 78750. The most recent, filed September 12, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work replace existing hvac system with a new 2.5-ton horizontal goodman system like-for-like”.
Compiled from City of Austin records · updated Sep 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 12, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replace existing hvac system with a new 2.5-ton horizontal goodman system like-for-like
- AppliedSep 11, 2025
- IssuedSep 12, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 9, 2025
Passed final inspection Oct 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work replace existing hvac system with a new 2.5-ton horizontal goodman system like-for-like
Replacement of complete existing central heat and air system with or without duct work replace existing hvac system with a new 2.5-ton horizontal goodman system like-for-like
City of Austin permitMechanical PermitFinal- Record
- 2025-115718 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9108 Spring Lake Dr
What is being built at 9108 Spring Lake Dr?
The latest filing (City of Austin permit 2025-115718 MP, September 12, 2025) covers replacement of complete existing central heat and air system with or without duct work replace existing hvac system with a new 2.5-ton horizontal goodman system like-for-like.
How many permits and filings does 9108 Spring Lake Dr have?
1 filing across 1 project, from September 12, 2025 to September 12, 2025.
Is there other construction near 9108 Spring Lake Dr?
Yes. Nearby filings include 9205 Springwood Dr (*partial demolition* addition/handrail remodel of attached covered/uncovered two-level deck, Jul 22, 2026); 9201 Spring Hollow Dr (adding 160 sq ft to existing pool cabana and kitchen: adding 23sf to outdoor storage: adding 502 sq ft to existing covered wood deck on 2nd floor new roof tie into existing cabana roof, Dec 8, 2023); 9102 Spring Lake Dr (replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal heat pump system, May 7, 2025).
How do I get alerts for new permits at 9108 Spring Lake Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 9205 Springwood DrJul 22, 2026*partial demolition* addition/handrail remodel of attached covered/uncovered two-level deck · 58 m away
- 9201 Spring Hollow DrDec 8, 2023Adding 160 sq ft to existing pool cabana and kitchen: adding 23sf to outdoor storage: adding 502 sq ft to existing covered wood deck on 2nd floor new roof tie into existing cabana roof · 61 m away
- 9102 Spring Lake DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal heat pump system · 95 m away
- 9303 Springwood DrAug 14, 2026Replacement of complete existing central heat and air system with or without duct work replace existing heat pump hvac system with like-for-like units (changeout/alteration) · 96 m away
- 9208 Springwood DrMay 16, 2024Replacement of an existing water heater · 100 m away
- 9200 Cedar Forest DrNov 16, 2023Tunnel below the foundation to repair drain lines · 105 m away
- 9305 Springwood DrFeb 18, 2026Interior remodel and garage conversion · 126 m away
- 9202 Cedar Forest DrJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 9307 Springwood DrAug 10, 2026New construction accessory use in-ground pool · 156 m away
- 9300 Spring Hollow DrJan 2, 2024Cut over 200a service upgrade · 158 m away
- 9016 Mountain Lake CirApr 11, 2024Replacing main panel (200 amps) · 162 m away
- 9204 Cedar Forest DrJul 14, 2026Pool- underground pool and spa construction · 163 m away