Vandegrift HS site plan approved; field-area retaining wall permitted
A retaining wall is planned within the detention pond area associated with Vandegrift High School’s baseball and softball fields. An Austin building permit dated December 8, 2025, is marked final; the school site plan was approved and released on March 27, 2026.
Summarized from City of Austin records · updated Mar 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 27, 2026
- since Dec 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruction of a retaining wall within detention pond area associated with vandergrift high school baseball & softball fields. (sp-2024-132168) work is located within the floodplain and designed per drainage and civil engineering plans
- AppliedNov 7, 2025
- IssuedDec 8, 2025
- WorkDec '25 – Jun '26
- Final inspectionJun 11, 2026
Passed final inspection Jun 11, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsConstruction of a retaining wall within detention pond area associated with vandergrift high school baseball & softball fields. (sp-2024-132168) work is located within the floodplain and designed per drainage and civil engineering plans
Construction of a retaining wall within detention pond area associated with vandergrift high school baseball & softball fields. (sp-2024-132168) work is located within the floodplain and designed per drainage and civil engineering plans
City of Austin permitBuilding PermitFinal- Record
- 2025-152505 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9500 Mc Neil Dr
What is being built at 9500 Mc Neil Dr?
Austin permit records describe a retaining wall within a detention pond area associated with Vandegrift High School’s baseball and softball fields. A related school site plan was approved and released on March 27, 2026.
Is a new school being built at 9500 Mc Neil Dr?
The records provided do not describe construction of a new school. They list a site plan for Vandegrift High School and a retaining wall associated with its baseball and softball fields.
When was the retaining wall permitted at Vandegrift High School?
The Austin building permit record is dated December 8, 2025, and has a final status. Its permit number is 2025-152505 BP.
What is the status of the Vandegrift High School site plan?
The City of Austin case was approved and released on March 27, 2026. The case number is 13408609.
Is the retaining wall work in a floodplain?
The permit description says the work is located within the floodplain and designed according to drainage and civil engineering plans.
How much will the Vandegrift High School work cost?
The records provided do not include a project cost estimate or reported valuation.
Also being built nearby
All of 78750- 9415 Mc Neil DrJan 5, 2010Forestar real estate group ribelin ranch m-family tract (resub of sp-2008-0555c) · 418 m away
- 9700 Mc Neil DrJan 29, 2026Leander independent school district - ribelin ranch development · 504 m away
- 9417 Solana Vista LoopNov 26, 2024Replacement of an existing water heater · 541 m away
- 9412 Solana Vista LoopJun 12, 2026Replacement of an existing water heater replacing the two gas tank water heaters with similar models · 556 m away
- 9413 Solana Vista LoopNov 19, 2025Replacement of an existing water heater install 40gal water heater · 561 m away
- 7505 Colina Vista LoopMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2-stage horizontal gas system · 563 m away
- 9516 Solana Vista LoopSep 12, 2024Replacement of complete existing central heat and air system with or without duct work · 566 m away
- 7512 Colina Vista LoopJan 19, 2025Replacement of complete existing central heat and air system with or without duct work · 592 m away
- 7316 Bandera Ranch TrlMar 1, 2024Replace prv in yard · 593 m away