9904 Dueling Oak Cir

Austin, TX 78750

Study mini-split and condenser electrical work permitted

City of Austin permits filed September 23, 2026, indicate a 9,000-BTU, 115-volt mini-split for a study at 9904 Dueling Oak Cir, with electrical work to connect its condenser. Both permits are listed as active; a separate permit for replacement of the home’s central heating and air system was finalized in April 2024.

Summarized from City of Austin records · updated Sep 23, 2026

Projects
3
3 filings
Latest filing
Sep 23, 2026
since Apr 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Tie condenser into existing dedicated 120v circuit; disconnect in sight of unit per nameplate (20a max mca 17a)

  1. AppliedSep 23, 2026
  2. IssuedSep 23, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
32% through of the permit windowSep 23, 2026 → Mar 22, 2027

Permit & project history

3 projects
  1. Tie condenser into existing dedicated 120v circuit; disconnect in sight of unit per nameplate (20a max mca 17a)

    Tie condenser into existing dedicated 120v circuit; disconnect in sight of unit per nameplate (20a max mca 17a)

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 9k btu 115v mini-split for study; pre-charged quick-connect lineset condensate to daylight

    9k btu 115v mini-split for study; pre-charged quick-connect lineset condensate to daylight

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9904 Dueling Oak Cir

What is being built at 9904 Dueling Oak Cir?

City of Austin permits indicate a 9,000-BTU mini-split is planned for a study, along with electrical work for its condenser. Both permits were filed September 23, 2026, and are listed as active.

Is a new mini-split being installed at 9904 Dueling Oak Cir?

A mechanical permit describes a 9,000-BTU, 115-volt mini-split for the study. Permit 2026-125747 MP was filed September 23, 2026, and is listed as active.

What electrical work is planned at 9904 Dueling Oak Cir?

Permit 2026-125740 EP describes connecting the condenser to an existing dedicated 120-volt circuit and installing a disconnect in sight of the unit. It was filed September 23, 2026, and is listed as active.

When were the permits filed for work at 9904 Dueling Oak Cir?

The mechanical permit 2026-125747 MP and electrical permit 2026-125740 EP were both filed September 23, 2026.

Was the central heating and air system at 9904 Dueling Oak Cir also replaced?

A City of Austin mechanical permit filed April 3, 2024, describes replacement of the existing central heating and air system, with or without duct work. That permit, 2024-038719 MP, is listed as final.