1020 Ellingson Ln
Austin, TX 78751
1020 Ellingson Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1020 Ellingson Ln, Austin, TX 78751. The most recent, filed September 10, 2024, covers: “Gas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure”.
Compiled from City of Austin records · updated Sep 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2024
- since Sep 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure
- AppliedSep 10, 2024
- IssuedSep 10, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 11, 2024
Passed final inspection Sep 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure
Gas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure
City of Austin permitPlumbing PermitFinal- Record
- 2024-122564 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1020 Ellingson Ln
What is being built at 1020 Ellingson Ln?
The latest filing (City of Austin permit 2024-122564 PP, September 10, 2024) covers gas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure.
How many permits and filings does 1020 Ellingson Ln have?
1 filing across 1 project, from September 10, 2024 to September 10, 2024.
What is being built near City Of Austin in Austin?
1020 Ellingson Ln is about 144 m from City Of Austin (1900 To 4500 Airport Blvd). Its latest filing is for gas meter locked out by texas gas. we repaired several leaks. we also fixed two red tagged items (drip leg and flue pipe on heater). gas system is now sound and holding pressure.
Is there other construction near 1020 Ellingson Ln?
Yes. Nearby filings include 1016 Ellingson Ln (replacement of complete existing central heat and air system with or without duct work, Apr 9, 2025); 1014 Ellingson Ln (installation of 10.4 kw dc solar pv system to roof of residence with 27 kwh energy storage system, Oct 28, 2025); 1027 Ellingson Ln (express replace windows and outside trim around, Aug 25, 2025).
How do I get alerts for new permits at 1020 Ellingson Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 1016 Ellingson LnApr 9, 2025Replacement of complete existing central heat and air system with or without duct work · 34 m away
- 1014 Ellingson LnOct 28, 2025Installation of 10.4 kw dc solar pv system to roof of residence with 27 kwh energy storage system · 53 m away
- 1027 Ellingson LnAug 25, 2025Express replace windows and outside trim around · 67 m away
- 1028 Ellingson LnSep 23, 2026Upgrading old electrical service · 76 m away
- 1031 Ellingson LnJan 6, 2015Mayfair terrace resub of lot 27 · 95 m away
- 1010 Ellingson LnJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 1011 E 45th StNov 19, 2025Pier & bean repair drain line under house · 107 m away
- 1011 Ellingson LnAug 19, 2025Added a prv in front yard. they had 100 psi · 116 m away
- 1017 E 44th StSep 4, 2026Express - foundation repair · 137 m away
- 1015 E 44th StOct 7, 2024Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 1007 Ellingson LnOct 12, 2026Set 200 amp overhead temp ref. 2026-074383 bp · 144 m away
- 1900 To 4500 Airport Blvd · City Of AustinOct 17, 2024Airport blvd. section c2 45th street to mlk jr. blvd — renovation/alteration — installation of shared-use-path, bikeway, sidewalk, along airport blvd; some bus stop relocation/installation; update to manor intersection. total about 1,137,793sf of limits of construction · 144 m away