406 W 40th St
Austin, TX 78751
406 W 40th St: 1 project on record
City of Austin lists 1 filing across 1 project at 406 W 40th St, Austin, TX 78751. The most recent, filed November 19, 2024, covers: “Gas test”.
Compiled from City of Austin records · updated Nov 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 19, 2024
- since Nov 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas test
- AppliedNov 18, 2024
- IssuedNov 19, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 20, 2024
Passed final inspection Nov 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas test
Gas test
City of Austin permitPlumbing PermitFinal- Record
- 2024-152852 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 406 W 40th St
What is being built at 406 W 40th St?
The latest filing (City of Austin permit 2024-152852 PP, November 19, 2024) covers gas test.
How many permits and filings does 406 W 40th St have?
1 filing across 1 project, from November 19, 2024 to November 19, 2024.
What is being built near Baker Center, Building A in Austin?
406 W 40th St is about 104 m from Baker Center, Building A (3908 Avenue B). Its latest filing is for gas test.
Is there other construction near 406 W 40th St?
Yes. Nearby filings include 408 W 40th St (express foundation repair, May 30, 2024); 4004 Avenue B (express: foundation repair/level of pier and beam house - replace 13 cedar piers with 10 code-compliant concrete cylinder piers. replace 30 damaged beam with pressure-treated 4x6 structural lumber. remove debris under the house, Nov 28, 2023); 4005 Avenue A (200-amp overhead service rebuild, May 14, 2024).
How do I get alerts for new permits at 406 W 40th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 408 W 40th StMay 30, 2024Express foundation repair · 31 m away
- 4004 Avenue BNov 28, 2023Express: foundation repair/level of pier and beam house - replace 13 cedar piers with 10 code-compliant concrete cylinder piers. replace 30 damaged beam with pressure-treated 4x6 structural lumber. remove debris under the house · 43 m away
- 4005 Avenue AMay 14, 2024200-amp overhead service rebuild · 62 m away
- 4005 Avenue BDec 20, 2023Construct new driveway approach of 17.11 ft. driveway approach is from the alley. *rs · 76 m away
- 4009 Avenue AMay 19, 2026Install level 2 ev charger · 87 m away
- 4010 Avenue BOct 12, 2026Eplan: residential expedited review - addition and remodel to existing 2-story single family res. [2bed 2bath] work to include: first floor interior remodel first floor addition replacement of doors/windows new rear patio new beds new baths [4bed 3.5bath]. 4010 avenue b · 93 m away
- 4011 Avenue ANov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 3908 Avenue B · Baker Center, Building AApr 30, 2026Change of use from office to restaurant and add new restroom prep area and service counter to existing 1520 sq ft building · 104 m away
- 3909 Avenue BDec 31, 2025Express: foundation repair · 108 m away
- 4000 Avenue COct 5, 2026Replacement of complete existing central heat and air system with or without duct work rheem 3.0 ton · 119 m away
- 4005 Guadalupe StJul 16, 2025Remove + replace (8) existing windows like-for-like no remodel no structural changes · 140 m away
- 4101 Avenue AFeb 12, 2009Hyde park addition no. 2, resubdivision of lots 14-16, block 4 — hyde park addition no. 2, resubdivision of lots 14-16, block 4 · 143 m away