4515 Airport Blvd

Austin, TX 78751

4515 Airport Blvd permit covers an RPZ replacement

A City of Austin plumbing permit filed February 19, 2026, covers replacing an existing RPZ beneath a soda cabinet, testing the replacement and submitting the test report. The permit is marked final; the records also show two Airport/IH 35 site-plan cases approved and released in 2018.

Summarized from City of Austin records · updated Feb 19, 2026

Projects
4
4 filings
Latest filing
Feb 19, 2026
since Apr 1, 2011
Largest scope
—
Listed value
—

Where this project stands

Finaled

The existing rpz located under the left side of the soda cabinet will need to be replaced. once the new rpz is installed it will be tested and the test report will be submitted through the weir portal

  1. AppliedFeb 18, 2026
  2. IssuedFeb 19, 2026
  3. WorkFeb '26 – Feb '26
  4. Final inspectionFeb 20, 2026

Passed final inspection Feb 20, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. The existing rpz located under the left side of the soda cabinet will need to be replaced. once the new rpz is installed it will be tested and the test report will be submitted through the weir portal

    The existing rpz located under the left side of the soda cabinet will need to be replaced. once the new rpz is installed it will be tested and the test report will be submitted through the weir portal

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Airport/IH 35

    Airport/ih 35

    City of Austin casesite_planApproved and Released
    Record
    11554994
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Airport/IH35 (Resubmittal of SP-2010-0097C)

    Airport/ih35 (resubmittal of sp-2010-0097c)

    City of Austin casesite_planApproved and Released
    Record
    10567957
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Airport/IH35

    Airport/ih35

    City of Austin casesite_planWithdrawn
    Record
    10424107
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4515 Airport Blvd

What is being built at 4515 Airport Blvd?

The latest record is a plumbing permit for replacing an existing RPZ beneath a soda cabinet, not a permit for a new building. The City of Austin marked permit 2026-019044 PP final.

When was the latest permit filed for 4515 Airport Blvd?

The latest permit was filed February 19, 2026. It covers an RPZ replacement and testing.

What does permit 2026-019044 PP cover?

It covers replacing the existing RPZ located under the left side of a soda cabinet. The permit description says the replacement will be tested and a report submitted through the Weir portal.

Is a new building planned at 4515 Airport Blvd?

The records provided do not identify a new building. They include a 2026 plumbing permit and two Airport/IH 35 site-plan cases approved and released in 2018.

What are the Airport/IH 35 site-plan cases for 4515 Airport Blvd?

The City of Austin records list cases 11554994 and 10567957, both dated January 11, 2018, as approved and released. Case 10567957 is identified as a resubmittal of SP-2010-0097C.