4518 Speedway
Austin, TX 78751
4518 Speedway: 1 project on record
City of Austin lists 1 filing across 1 project at 4518 Speedway, Austin, TX 78751. The most recent, filed February 28, 2025, covers: “Replacement of an existing water heater 1for1 wh swap”.
Compiled from City of Austin records · updated Feb 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 28, 2025
- since Feb 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of an existing water heater 1for1 wh swap
Replacement of an existing water heater 1for1 wh swap
City of Austin permitPlumbing PermitFinal- Record
- 2025-021126 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4518 Speedway
What is being built at 4518 Speedway?
The latest filing (City of Austin permit 2025-021126 PP, February 28, 2025) covers replacement of an existing water heater 1for1 wh swap.
How many permits and filings does 4518 Speedway have?
1 filing across 1 project, from February 28, 2025 to February 28, 2025.
Is there other construction near 4518 Speedway?
Yes. Nearby filings include 4517 Avenue D (total demolition of detached carport 220 sq ft circa 1946 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** 9/3 cm carport was removed prior to permit, Jun 6, 2025); 4521 Avenue D (cap off water and wastewater, Dec 2, 2025); 4519 Avenue D (per tx gas we need to relocate the gas meter away from windows electrical to new gas riser location, Aug 5, 2025).
How do I get alerts for new permits at 4518 Speedway?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4517 Avenue DJun 6, 2025Total demolition of detached carport 220 sq ft circa 1946 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** 9/3 cm carport was removed prior to permit · 48 m away
- 4521 Avenue DDec 2, 2025Cap off water and wastewater · 49 m away
- 4519 Avenue DAug 5, 2025Per tx gas we need to relocate the gas meter away from windows electrical to new gas riser location · 50 m away
- 4523 Avenue DJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 4525 SpeedwayJul 22, 2025Request to disconnect. meter socket and panel replacement also grounding and bonding · 61 m away
- 4508 SpeedwayNov 4, 2025Upgrading overhead electrical service to 200 amps · 82 m away
- 4518 Avenue DAug 4, 2025Per tx gas we need to relocate the gas away from electrical windows tankless · 92 m away
- 4506 SpeedwayFeb 21, 2026Express: foundation repair - installing sonotubes piers · 99 m away
- 4505 SpeedwayMar 15, 2024Express: tub-to-shower conversion bathroom remodel · 109 m away
- 4507 Avenue DNov 24, 2023Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 4522 Avenue FOct 5, 2026Upgrading the electrical service main distribution panel and revenue meter mast · 114 m away
- 4504 SpeedwayAug 11, 2025Remove existing modified asphalt roof and replace with insulated tpo to meet citys r-25 code requirement · 117 m away