4809 Harmon Ave
Austin, TX 78751
9 solar panels and a 25 kWh backup battery at 4809 Harmon Ave
Austin permits show 9 solar panels being added to an existing PV system at 4809 Harmon Ave, along with a 25 kWh battery backup system. The related electrical permits were filed Dec. 31, 2024 (2024-164435 EP) and Jan. 13, 2025 (2025-000426 EP); both are marked final.
Summarized from City of Austin records · updated Jan 13, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jan 13, 2025
- since Jan 6, 2014
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsDisconnect/reconnect installing a 25 kwh battery back-up system
Disconnect/reconnect installing a 25 kwh battery back-up system
City of Austin permitElectrical PermitFinal- Record
- 2025-000426 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing 9 solar panels to existing pv system and installing a 25 kwh battery back-up system
Installing 9 solar panels to existing pv system and installing a 25 kwh battery back-up system
City of Austin permitElectrical PermitFinal- Record
- 2024-164435 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacing and relocating existing service panel main breaker with an enphase automatic transfer switch and allocating system adjacent to existing to house meter. 12/17/24 charles macconnell voiding permit as not panel replacement or upgrade was performed
Replacing and relocating existing service panel main breaker with an enphase automatic transfer switch and allocating system adjacent to existing to house meter. 12/17/24 charles macconnell voiding permit as not panel replacement or upgrade was performed
City of Austin permitElectrical PermitVOID- Record
- 2023-118178 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4809 Harmon Ave
What is being installed at 4809 Harmon Ave?
Austin permits describe 9 solar panels being added to an existing PV system and a 25 kWh battery backup system. The electrical permits are marked final.
Is there a battery backup system planned for 4809 Harmon Ave?
Yes. Permit 2024-164435 EP, filed Dec. 31, 2024, describes installing a 25 kWh battery backup system alongside 9 solar panels.
How many solar panels are being added at 4809 Harmon Ave?
Permit 2024-164435 EP describes adding 9 panels to an existing PV system. It was filed Dec. 31, 2024, and is marked final.
When were the solar and battery permits filed at 4809 Harmon Ave?
The permits were filed Dec. 31, 2024 (2024-164435 EP) and Jan. 13, 2025 (2025-000426 EP). Both are marked final.
What does permit 2025-000426 EP cover at 4809 Harmon Ave?
The Jan. 13, 2025 electrical permit describes disconnecting and reconnecting to install a 25 kWh battery backup system. Its status is final.
Also being built nearby
All of 78751- 4807 Harmon AveJan 17, 2025Generator install · 17 m away
- 4803 Harmon AveOct 14, 2026Base: installing a backup battery system and additional meter socket · 43 m away
- 919 Gene Johnson StMay 12, 2025**reference 2025-031960 bp** temporary power loop for construction · 66 m away
- 918 Gene Johnson StSep 19, 2024One access hole in front to gain access under pier and beam foundation to replace remainder of cast-iron drain system · 78 m away
- 923 E 49th StJun 30, 2025Service rebuild due to storm · 79 m away
- 4812 IH 35 SvrdJan 6, 2014Oscar snowden subdivision; resubdvision of lot 1 · 101 m away
- 1008 E 49th StAug 18, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 108 m away
- 4719 Harmon AveMar 1, 2024Emergency replace 100-gallon natural gas commercial water heater · 109 m away
- 920 E 49th StJan 13, 2025Excavate a 37 yard line to replace the city clean out · 117 m away
- 4905 Harmon AveFeb 15, 2024Repair gas leak pulled meter. replace water heater and bring up to code · 119 m away
- 4834 IH 35 SvrdMay 24, 2007Juventino rosas bus company · 124 m away
- 910 E 48th StJun 6, 2024Upgrade existing electrical service to 200 amps · 126 m away
More solar installs in 78751.