510 E 39th St
Austin, TX 78751
House addition and remodel, including work on the existing garage
City of Austin records describe an addition and remodel of the existing house at 510 E 39th St, including a new front porch. The building permit was filed March 19, 2025, and remains active; a plan revision changed the garage scope from demolition and a new carport to remodeling the existing garage. Later permits cover carport electrical work, an irrigation system, and a driveway approach.
Summarized from City of Austin records · updated Sep 23, 2026
- Projects
- 9
- 9 filings
- Latest filing
- Sep 23, 2026
- since Mar 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 18 ft. driveway approach is from the alley
- AppliedDec 31, 2024
- IssuedSep 23, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 14, 2026
Passed final inspection Oct 14, 2026.
Permit & project history
9 projectsConstruct new driveway approach of 18 ft. driveway approach is from the alley
Construct new driveway approach of 18 ft. driveway approach is from the alley
City of Austin permitDriveway / SidewalksFinal- Record
- 2026-120602 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New irrigation system for existing residence. no prior irrigation system
New irrigation system for existing residence. no prior irrigation system
City of Austin permitPlumbing PermitActive- Record
- 2026-121311 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New carport rear of main house alley access
New carport rear of main house alley access
City of Austin permitElectrical PermitFinal- Record
- 2025-032284 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New carport rear of main house alley access the original permit documents included a full demolition of the existing garage and construction of a new carport. applicant to use this bp to remodel garage instead of constructing a new carport. revision this plan revision changes the scope to a remodel of the existing garage. the permit for the full garage demolition should be voided and the permit for the carport should be amended with the scope on the attached drawings. on 09/11/2026 i change the required inspection for driveway approach to yes. the approach is shown on the plan sheet. sam west. a full set of drawings is submitted. the revised scope for the garage remodel is shown on the following sheets: a0.95 a1.01 a1.71 a1.81 a2.01a a4.03 a4.04
New carport rear of main house alley access the original permit documents included a full demolition of the existing garage and construction of a new carport. applicant to use this bp to remodel garage instead of constructing a new carport. revision this plan revision changes the scope to a remodel of the existing garage. the permit for the full garage demolition should be voided and the permit for the carport should be amended with the scope on the attached drawings. on 09/11/2026 i change the required inspection for driveway approach to yes. the approach is shown on the plan sheet. sam west. a full set of drawings is submitted. the revised scope for the garage remodel is shown on the following sheets: a0.95 a1.01 a1.71 a1.81 a2.01a a4.03 a4.04
City of Austin permitBuilding PermitFinal- Record
- 2025-032284 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
City of Austin permitMechanical PermitFinal- Record
- 2025-032283 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
**reference 2025-032283** temp construction loop
**reference 2025-032283** temp construction loop
City of Austin permitElectrical PermitFinal- Record
- 2025-013690 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
City of Austin permitElectrical PermitFinal- Record
- 2025-032283 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage
City of Austin permitPlumbing PermitFinal- Record
- 2025-032283 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage revision: he original permit documents included a full demolition of the existing garage and construction of a new carport. this plan revision changes the scope to a remodel of the existing garage. the permit for the full garage demolition should be voided and the permit for the carport should be amended with the scope on the attached drawings. a full set of drawings is submitted. the revised scope for the garage remodel is shown on the following sheets: a0.95 a1.01 a1.71 a1.81 a2.01a a4.03 a4.04
Addition and remodel of main house renovation/addition to existing house new front porch new carport demolish existing garage revision: he original permit documents included a full demolition of the existing garage and construction of a new carport. this plan revision changes the scope to a remodel of the existing garage. the permit for the full garage demolition should be voided and the permit for the carport should be amended with the scope on the attached drawings. a full set of drawings is submitted. the revised scope for the garage remodel is shown on the following sheets: a0.95 a1.01 a1.71 a1.81 a2.01a a4.03 a4.04
City of Austin permitBuilding PermitActive- Record
- 2025-032283 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 510 E 39th St
What is being built at 510 E 39th St in Austin?
Permits describe an addition and remodel of the existing house, including a new front porch. The plans were revised to remodel the existing garage rather than demolish it and build a new carport.
When was the remodel at 510 E 39th St permitted?
The building permit, 2025-032283 BP, was filed March 19, 2025, and is listed as active. Related plumbing and electrical permits were filed in April 2025.
Is a new house being built at 510 E 39th St?
The permits describe an addition and remodel of an existing residence, not construction of a new house.
Is the garage at 510 E 39th St being demolished?
The original permit scope included demolishing the garage, but a revision changed the work to remodeling the existing garage. The revised building permit record is active.
What other work is permitted at 510 E 39th St?
Later City of Austin permits include electrical work for a carport, filed September 10, 2026; an irrigation system, filed September 15, 2026; and an 18-foot driveway approach, filed September 23, 2026.
Also being built nearby
All of 78751- 508 E 39th StJul 17, 2026Replacement of complete existing central heat and air system with or without duct work · 15 m away
- 515 E 39th StJul 18, 2024Construct new driveway approach of 20.1 ft and curb & gutter of 6 ft · 57 m away
- 511 E 40th StFeb 4, 2026Secondary contractor only exterior lines only- replace approximately 80 foot of sewer yard line from building structure to city tap · 71 m away
- 509 E 40th StMay 29, 2024Emergency repair per tx gas- relocate gas meter to side of house away from the street curb. emergency gas repair due to tx gas leak · 74 m away
- 3819 Duval StSep 21, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [2bed 2bath] with office covered porch and covered patio. building 2 · 89 m away
- 512 E 40th StMay 20, 2024Express foundation repair on pier & beam foundation · 111 m away
- 514 E 40th StDec 3, 2024Express: foundation repair · 112 m away
- 417 Towne Park TrlMar 5, 2025Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 427 Towne Park TrlJan 10, 2024Express - convert tub to shower new shower diverter and plumbing adjustments. flip electrical and plumbing in laundry room for washer and dryer to other side of wall (for access from garage). convert water heater to tankless system · 120 m away
- 504 E 38th Half StNov 3, 2026Construct new driveway approach of 10 ft and sidewalk of 20 lf and curb & gutter of 15 ft · 124 m away
- 422 Towne Park TrlFeb 5, 2025(alexander kathryn) - installation of circuit for elec. vehicle charging station - esip · 130 m away
- 431 Towne Park TrlFeb 5, 2025Replacement of complete existing central heat and air system with or without duct work scuttle located in hallway · 135 m away
More demolitions in 78751.