5108 Evans Ave
Austin, TX 78751
5108 Evans Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 5108 Evans Ave, Austin, TX 78751. The most recent, filed November 18, 2025, covers: “50 tunnel below the foundation to replace entire drain system. 2 access holes-left right”.
Compiled from City of Austin records · updated Nov 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2025
- since Nov 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project50 tunnel below the foundation to replace entire drain system. 2 access holes-left right
50 tunnel below the foundation to replace entire drain system. 2 access holes-left right
City of Austin permitPlumbing PermitFinal- Record
- 2025-136990 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5108 Evans Ave
What is being built at 5108 Evans Ave?
The latest filing (City of Austin permit 2025-136990 PP, November 18, 2025) covers 50 tunnel below the foundation to replace entire drain system. 2 access holes-left right.
How many permits and filings does 5108 Evans Ave have?
1 filing across 1 project, from November 18, 2025 to November 18, 2025.
Is there other construction near 5108 Evans Ave?
Yes. Nearby filings include 5107 Evans Ave (express- remove and replace shower surround in primary bathroom (existing shower surround approx. 3x3), Aug 3, 2026); 5105 Evans Ave (replacement of complete existing central heat and air system with or without duct work, Jul 21, 2026); 5112 Duval St (yard waste line replacement, Nov 3, 2026).
How do I get alerts for new permits at 5108 Evans Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5107 Evans AveAug 3, 2026Express- remove and replace shower surround in primary bathroom (existing shower surround approx. 3x3) · 57 m away
- 5105 Evans AveJul 21, 2026Replacement of complete existing central heat and air system with or without duct work · 61 m away
- 5112 Duval StNov 3, 2026Yard waste line replacement · 94 m away
- 5106 Duval StAug 13, 2025Covered patio addition rear · 95 m away
- 5104 Duval StDec 19, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system unit #1 · 97 m away
- 5114 Duval StAug 13, 2026Replace the front yard sewer line · 102 m away
- 5015 Evans AveJun 29, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 5012 Evans AveMay 27, 2026Replacement of complete existing central heat and air system with or without duct work 3.5 ton horizontal gas in attic - single stage · 111 m away
- 5200 Duval StApr 7, 2024Upgrade 100 amp service to 200 amp · 122 m away
- 5206 Evans AveOct 30, 2026Replacement of an existing water heater removing existing water heaters in attic and installing 2 new 50 gallon natural gas water heaters located in the attic · 129 m away
- 5206 Duval StSep 9, 2026Repair electrical service completely for emergency call after tree branches fell on top of city wires and damaged them · 151 m away
- 5204 Martin AveNov 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 9k high wall carrier mini split system · 155 m away