5204 Huisache St
Austin, TX 78751
About 30 feet of sewer line to be replaced
A City of Austin plumbing permit filed December 10, 2025, covers replacing about 30 feet of sewer line in the side yard of the front house at 5204 Huisache St. The work replaces old Orangeburg pipe with PVC; the permit is listed as final.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing aproximentally 30 foot of old main yard sewer line. replacing orangburge pipe with pvc. section is in the side yard of the front house
- AppliedDec 8, 2025
- IssuedDec 10, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 15, 2025
Passed final inspection Dec 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacing aproximentally 30 foot of old main yard sewer line. replacing orangburge pipe with pvc. section is in the side yard of the front house
Replacing aproximentally 30 foot of old main yard sewer line. replacing orangburge pipe with pvc. section is in the side yard of the front house
City of Austin permitPlumbing PermitFinal- Record
- 2025-155443 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5204 Huisache St
What work is permitted at 5204 Huisache St?
A City of Austin plumbing permit covers replacing about 30 feet of sewer line in the side yard of the front house with PVC.
When was the sewer line permit filed?
The permit was filed on December 10, 2025.
What type of pipe is being replaced at 5204 Huisache St?
The permit description says old Orangeburg pipe will be replaced with PVC.
What is the permit number for work at 5204 Huisache St?
The City of Austin permit number is 2025-155443 PP. It is listed as a plumbing permit with final status.
How much sewer line is being replaced?
The permit description says approximately 30 feet of the old sewer line will be replaced.
What is happening near Lamarloop 2025 on Huisache Street?
At 5204 Huisache St, a City of Austin permit filed December 10, 2025, covers replacing about 30 feet of sewer line with PVC.
Also being built nearby
All of 78751- 5202 Huisache StNov 10, 2026Building 8 new 2-story single-family residence [2bed 1.5bath] · 13 m away
- 5206 Huisache StSep 9, 2024Cap off water and waste water · 41 m away
- 5203 Huisache StNov 12, 2026Emergency: repair gas valve for stove to get lock removed from meter · 41 m away
- 613 Genard StMar 31, 2025Replaced existing cast iron hung pipe with hangers replaced toilet flange and replaced tub waste with new pop-up drain · 45 m away
- 614 Zennia StMay 15, 2025Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 5237 N Lamar Blvd · Lamarloop 2025 LLCOct 1, 2026Retail space remodel · 73 m away
- 609 Genard StSep 5, 2024Upgrading the existing 100-amp service to a 200-amp service. this will include a new 30 circuit panel board all new breakers a new meter base and all new associated conduit and wiring. this will also require the city of austin to upgrade the service drop conductors from the utility pole to the whether head. i will also need to schedule a disconnect of power to the residence and a reconnect after the work is complete · 77 m away
- 5237 Lamar BlvdMar 2, 2007Buck moore feed supply · 80 m away
- 610 Zennia StNov 17, 2023Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 5117 Lamar BlvdFeb 11, 2011Texan north lamar · 85 m away
- 5210 N Lamar BlvdOct 30, 202652 ten blade sign · 86 m away
- 615 Zennia StFeb 14, 2024Replacement of an existing ng water heater · 89 m away