A City of Austin electrical permit covers installation of a circuit for an electric vehicle charging station at 5501 Avenue H. The permit, 2026-115372 EP, was filed on September 11, 2026, and its status is Final.

Summarized from City of Austin records · updated Nov 18, 2026

Projects
2
2 filings
Latest filing
Nov 18, 2026
since Nov 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replace approximately 15 linear feet of the existing sanitary sewer line beneath the house including an affected sewer line extending into the yard. the existing sewer had lost the required slope resulting in inadequate drainage. the work consists of removing and replacing the affected piping correcting the slope to ensure proper gravity drainage and reconnecting to the existing sanitary sewer system. no new plumbing fixtures or additional sewer connections are proposed

  1. AppliedNov 17, 2026
  2. IssuedNov 18, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
1% through of the permit windowNov 18, 2026 → May 17, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replace approximately 15 linear feet of the existing sanitary sewer line beneath the house including an affected sewer line extending into the yard. the existing sewer had lost the required slope resulting in inadequate drainage. the work consists of removing and replacing the affected piping correcting the slope to ensure proper gravity drainage and reconnecting to the existing sanitary sewer system. no new plumbing fixtures or additional sewer connections are proposed

    Replace approximately 15 linear feet of the existing sanitary sewer line beneath the house including an affected sewer line extending into the yard. the existing sewer had lost the required slope resulting in inadequate drainage. the work consists of removing and replacing the affected piping correcting the slope to ensure proper gravity drainage and reconnecting to the existing sanitary sewer system. no new plumbing fixtures or additional sewer connections are proposed

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. (biggs brittany) - installation of circuit for elec. vehicle charging station - esip

    (biggs brittany) - installation of circuit for elec. vehicle charging station - esip

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5501 Avenue H

What is being installed at 5501 Avenue H in Austin?

A City of Austin permit covers installation of an electrical circuit for an electric vehicle charging station. The record does not specify details about the charging equipment.

Is an EV charging station coming to 5501 Avenue H?

The permit describes a circuit for an EV charging station. It does not provide further details about the station.

When was the permit filed for 5501 Avenue H?

The City of Austin filed electrical permit 2026-115372 EP on September 11, 2026.

What is the permit number for the work at 5501 Avenue H?

The permit number is 2026-115372 EP. It covers installation of a circuit for an electric vehicle charging station.

Is the 5501 Avenue H permit final?

Yes. The City of Austin permit record lists its status as Final.