608 Genard St: 1 project on record
City of Austin lists 1 filing across 1 project at 608 Genard St, Austin, TX 78751. The most recent, filed August 30, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 30, 2024
- since Aug 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 26, 2024
- IssuedAug 30, 2024
- WorkAug '24 – Dec '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-108739 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 608 Genard St
What is being built at 608 Genard St?
The latest filing (City of Austin permit 2024-108739 MP, August 30, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 608 Genard St have?
1 filing across 1 project, from August 30, 2024 to August 30, 2024.
Is there other construction near 608 Genard St?
Yes. Nearby filings include 604 Genard St (installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included, Jul 18, 2025); 609 Genard St (upgrading the existing 100-amp service to a 200-amp service. this will include a new 30 circuit panel board all new breakers a new meter base and all new associated conduit and wiring. this will also require the city of austin to upgrade the service drop conductors from the utility pole to the whether head. i will also need to schedule a disconnect of power to the residence and a reconnect after the work is complete, Sep 5, 2024); 603 W North Loop Blvd (excavate 18 tunnel to repair main drain line under the house, May 18, 2026).
How do I get alerts for new permits at 608 Genard St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 604 Genard StJul 18, 2025Installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included · 21 m away
- 609 Genard StSep 5, 2024Upgrading the existing 100-amp service to a 200-amp service. this will include a new 30 circuit panel board all new breakers a new meter base and all new associated conduit and wiring. this will also require the city of austin to upgrade the service drop conductors from the utility pole to the whether head. i will also need to schedule a disconnect of power to the residence and a reconnect after the work is complete · 60 m away
- 603 W North Loop BlvdMay 18, 2026Excavate 18 tunnel to repair main drain line under the house · 62 m away
- 5206 Guadalupe StFeb 6, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 613 Genard StMar 31, 2025Replaced existing cast iron hung pipe with hangers replaced toilet flange and replaced tub waste with new pop-up drain · 85 m away
- 5211 Guadalupe StJan 26, 2026Install new 6.16 kw dc rooftop solar system to existing residential · 87 m away
- 606 W North Loop BlvdMar 30, 2026100 tunnel below the foundation to replace entire cast iron drain system. 4 access holes. front right back back · 94 m away
- 508 Genard StSep 4, 2025*partial demolition* addition/remodel to create duplex notary to be confirmed 6/6.5 9/4 cm re-opened at ae request. (laura) contractor needs to upload corrected espa · 99 m away
- 5202 Guadalupe StMay 31, 202410-foot tunnel below the foundation to repair bathroom drain line and main line to cleanout · 101 m away
- 5206 Huisache StSep 9, 2024Cap off water and waste water · 105 m away
- 610 Zennia StNov 17, 2023Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 5203 Huisache StNov 12, 2026Emergency: repair gas valve for stove to get lock removed from meter · 112 m away