909 Ellingson Ln
Austin, TX 78751
909 Ellingson Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 909 Ellingson Ln, Austin, TX 78751. The most recent, filed October 9, 2024, covers: “Trench to reroute yard sewer main and correct sloping of existing pvc drain system below the foundation (pier and beam)”.
Compiled from City of Austin records · updated Oct 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2024
- since Oct 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredTrench to reroute yard sewer main and correct sloping of existing pvc drain system below the foundation (pier and beam)
- AppliedAug 2, 2024
- IssuedOct 9, 2024
- !WorkOct '24 – May '25
- Final inspection
Marked expired May 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTrench to reroute yard sewer main and correct sloping of existing pvc drain system below the foundation (pier and beam)
Trench to reroute yard sewer main and correct sloping of existing pvc drain system below the foundation (pier and beam)
City of Austin permitPlumbing PermitExpired- Record
- 2024-097317 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 909 Ellingson Ln
What is being built at 909 Ellingson Ln?
The latest filing (City of Austin permit 2024-097317 PP, October 9, 2024) covers trench to reroute yard sewer main and correct sloping of existing pvc drain system below the foundation (pier and beam).
How many permits and filings does 909 Ellingson Ln have?
1 filing across 1 project, from October 9, 2024 to October 9, 2024.
Is there other construction near 909 Ellingson Ln?
Yes. Nearby filings include 910 E 44th St (replacement of an existing water heater, Dec 15, 2023); 908 E 44th St (replacement of complete existing central heat and air system with or without duct work, Jan 24, 2024); 905 Ellingson Ln (replace sewer yard line from house connection to city tap, May 12, 2026).
How do I get alerts for new permits at 909 Ellingson Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 910 E 44th StDec 15, 2023Replacement of an existing water heater · 19 m away
- 908 E 44th StJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 20 m away
- 905 Ellingson LnMay 12, 2026Replace sewer yard line from house connection to city tap · 35 m away
- 911 E 44th StMar 26, 2025Cap off water/waste water · 60 m away
- 909 E 44th StNov 12, 2026Cap off water and waste water · 60 m away
- 1006 E 44th StMay 4, 2026Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 72 m away
- 1007 Ellingson LnOct 12, 2026Set 200 amp overhead temp ref. 2026-074383 bp · 74 m away
- 4405 Red River StMay 12, 2026Replace sewer yard line from house connection to city tap · 75 m away
- 1005 E 44th StAug 12, 2025Upgrade service to 200amp · 83 m away
- 4414 Red River StNov 5, 2026Set a 200a tpole ref 2026-108369 bp · 100 m away
- 4418 Red River StDec 28, 2023***per coordination with 23-134850 ex this project has cleared the row. conflict check required for extension*** construct new driveway approach of 12 ft and curb & gutter of 7 ft.*shay inspections to occur concurrently with second driveway permitted 23-135432 ds 12/28 customer confirmed understanding that he must have bp revised to remove sidewalk inspection in order to proceed with other permits/inspections impacted by bp**shay conflicts: ryno utilities and services llc rynoutilitieservice@gmail.com khanah@hotmail.com 512-269-8736 permit #23-117662 ex cleared the row · 102 m away
- 1009 E 44th StDec 14, 2023Install an irrigation system to permit address · 106 m away